Tender Details
Particulars | Details |
---|---|
Title |
A/Mtc. Of Sewerage Scheme In Sector 5, U/E, Rohtak
|
Description |
Repairing Of Sewerage Manholes With Brick Work And Plastering Works Casting Of Broken Slab Of Manholes Etc. At Various Places In Sector 5, Rohtak And All Other Works Contingent Thereto
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2025_DTP_526705_1 |
Reference Number |
62/2025 |
Tender Fee | 1430 |
EMD | 3820 |
Tender Value | |
Place | Executive Engineer HSVP Division No. I, Rohtak |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=517421 |
Start Date | April 11, 2025 22:30 |
End Date |
16/04/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Expression of interest (eoi) from reputed contractors having experience in expressway/ highway/ irrigation/ railway/ metro/ high speed rail/ power sector india/ overseas
Expression of interest (eoi) from reputed 
 contractors having experience in expressway/ 
 highway/ irrigation/ railway/ metro/ high speed
 rail/ power sector india/ overseas
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreSitc of gas,flame,heat,multisensor detection system in 18nos of ggs of ankleshwar asalong with camc of 5 years
Sitc of gas,flame,heat,multisensor detection system in 18nos of ggs of ankleshwar asalong with camc of 5 years
Read moreConst. of 4lane elevated road in jodhpur city portion from mahamandir ch.0.000 to akhaliya chouraha ch.7.633) in rajasthan on ham under nh(o) scheme
Const. of 4lane elevated road in jodhpur city portion from mahamandir ch.0.000 to akhaliya chouraha ch.7.633) in rajasthan on ham under nh(o) scheme
Read moreConstruction work of drain on 24.00 m wide road in transport nagar scheme.
Construction work of drain on 24.00 m wide road in transport nagar scheme.
Read moreConstruction work of cable duct in transport nagar scheme.
Construction work of cable duct in transport nagar scheme.
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreConstruction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Construction of lane no. 3, 4, 5 and internal roads of chopra farm in rishikesh constituency of dehradun district under state sector.
Read moreConstruction of damaged (co...
Construction of damaged (condemn) building of high school in village kundal under village development scheme at imt kharkhoda
Read moreof your Industry type