Tender Details
Particulars | Details |
---|---|
Title |
Wbpwrd/Ee/Bhd I/E Nit28/24 25/2
|
Description |
Road Safety Works On 1. Dumdum Lauhati Road From 1.00 Kmp. To 7.50 Km. 2. Dumdum Lauhati Road From 7.50 Km. To 12.50 Km. 3. Patipukur Rajarhat Road From 3.95 Km. To 9.58 Km. 4. Lauhati Haroa Road From 0.00 Kmp. To 3.20 Km. Under Barasat Hi
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_822519_1 |
Reference Number |
WBPWRD/EE/BHD-I/eNIT-28/24-25 |
Tender Fee | 0 |
EMD | 1.99 Lakh |
Tender Value | |
Place | BAGUIHATI |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1830256 |
Start Date | March 10, 2025 14:30 |
End Date |
26/03/2025 ( Expired 51 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Improvement to tangi bhatimunda road from 1/987 km to 2/425 km, 2/700 km to 2/800 km, 3/100 km to 3/625 km and 4/285 km to 5/345 km in the district of cuttack.
Read morePr of roads from (1) gariadafadar para tsr camp to pmgsy road link no. l035 (l-1.00 km), (2) maiman sing para to maragang para (l027) (l-1.095 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting etc. durin
Pr of roads from (1) gariadafadar para tsr camp to pmgsy road link no. l035 (l-1.00 km), (2) maiman sing para to maragang para (l027) (l-1.095 km) under jurisdiction of kalyanpur pwd(randb) sub-division. / sh- patch metaling, re-carpeting etc. durin
Read moreMtc. of road from (1) dhanchakma road to tarachand rupini para (l-1.70 km), (2) gm road to golabari-ghilatali road via pakpaibari road (l-2.40 km), (3) gm road to golabari-ghilatali road via sanatan das para road (l-2.00 km) during the year 2025-26/
Mtc. of road from (1) dhanchakma road to tarachand rupini para (l-1.70 km), (2) gm road to golabari-ghilatali road via pakpaibari road (l-2.40 km), (3) gm road to golabari-ghilatali road via sanatan das para road (l-2.00 km) during the year 2025-26/
Read moreRequest for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Read moreSpecial repair by pdg.wdg.stg.ipbpc of 5 nos. roads i.e. 1.wdg.stg.pc on road from jodhkan to ding mor road id 11586, 2.pdg. ipbpc on road from kanwarpura approach road km.0 to 1.80 road id 5983
Special repair by pdg.wdg.stg.ipbpc of 5 nos. roads i.e. 1.wdg.stg.pc on road from jodhkan to ding mor road id 11586, 2.pdg. ipbpc on road from kanwarpura approach road km.0 to 1.80 road id 5983
Read morePecial repair by pdg.wdg.stg.,ipbraising and pc of 5 nos. roads i.e. 1.pdg. ipb pc on road from kotli to phoolkan road id10226 km.0 to 4.30, 2. pdg. wdg.and stg. pc road from kanwarpura to phoolkan km.0 to 3.40 road id 9605
Special repair by pdg.wdg.stg.,ipbraising and pc of 5 nos. roads i.e. 1.pdg. ipb pc on road from kotli to phoolkan road id10226 km.0 to 4.30, 2. pdg. wdg.and stg. pc road from kanwarpura to phoolkan km.0 to 3.40 road id 9605
Read moreImprovements to madikonda to narayanagiri road from km 3/2 to 4/2 (in elkurthy village limits) of hanumakonda district
Improvements to madikonda to narayanagiri road from km 3/2 to 4/2 (in elkurthy village limits) of hanumakonda district
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read moreWbpwd/pw(r)/sepd/piu-i/nit-04 of 2025-2026,sl-1
Two lanning of bongaon-bagdah-boyra road 0.00 kmp to 18.00 kmp and halencha-sindrani-duttafulia road from 0.00 kmp to 17.60 kmp (sh-3) under barasat division, pwd in the district of north 24 parganas.
Read moreof your Industry type