Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Fresh Water Tank Breather Line Uprooted From Main Deck Same Needs To Be W
|
| Description |
|
| Organisation | Department of Defence | Ministry of Defence |
| Tender Id | GEM/2023/B/3735095 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | July 24, 2023 22:35 |
| End Date |
Expired
04/08/2023
Expired 1169 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | J.A. ENTERPRISE | 04-08-2023 13:27:42 | MSE | Disqualified |
| 2 | J.K.MARINE WORKS | 04-08-2023 11:02:24 | N/A | Qualified |
| 3 | JAY BALVIKRUPA ENGG AND ELECTRIC | 04-08-2023 11:33:52 | MSE | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ****** | Item Categories : Custom Bid for Services - Fresh water tank breather line uprooted from main deck Same needs to be w | - | L1 |
Turnkey jobs on tank breather hoods for icgs samarth at isrf
Turnkey jobs on tank breather hoods for icgs samarth at isrf
Read moreFacility management services - lumpsum based - undefined the work mentioned in the pdf needs to be serviced consumables to be provided by service provider (inclusive in contract cost)
Facility management services - lumpsum based - undefined the work mentioned in the pdf needs to be serviced consumables to be provided by service provider (inclusive in contract cost)
Read moreChemical cleaning of bathroom drain lines and fresh water lines to be repaired/renewed
Chemical cleaning of bathroom drain lines and fresh water lines to be repaired/renewed
Read moreInfrastructure facility for pressure test and mini-tank facility at transducer production / ns (s and cs) at be-bg.
Infrastructure facility for pressure test and mini-tank facility at transducer production / ns (s and cs) at be-bg.
Read moreShoe break and lining assy,slew lock cable,tube horizontal cylinder rh,cap lockable fuel tank,angle sensor with hsg,water separator cum filter,oil filter,fuel strainer,fuel filter cum water separator,air filter primary,air filter safety,transmission filter,hyd return line filter,tank breather,poly v belt,air dryer filter,air filter adblue,def tank filter suction,cylindrical roller bearing,ignition switch
Shoe break and lining assy,slew lock cable,tube horizontal cylinder rh,cap lockable fuel tank,angle sensor with hsg,water separator cum filter,oil filter,fuel strainer,fuel filter cum water separator,air filter primary,air filter safety,transmission filter,hyd return line filter,tank breather,poly v belt,air dryer filter,air filter adblue,def tank filter suction,cylindrical roller bearing,ignition switch
Read moreFacility management services - lumpsum based - commercial hiring of services for cleaning of fuel fresh water and lub oil tanks (as per soc) consumables to be provided by service provider (inclusive in contract cost)
Facility management services - lumpsum based - commercial hiring of services for cleaning of fuel fresh water and lub oil tanks (as per soc) consumables to be provided by service provider (inclusive in contract cost)
Read moreTrochanteric femur nail advanced system one set. spec: (1) 9 mm to 12 mm diameter with inbuilt set screw. (2) should be capable of allowing cannulated screw or blade (one) with same hole in proximal part. (3) end of blade and screw should be porous to allow augmentation with 5 mm distal locking option (two). (4) material should be titanium molybdenum. (complete range of size shape and side specific implant with instrumentation should be available at the time of surgery).[ item code no.:s6155
Trochanteric femur nail advanced system one set. spec: (1) 9 mm to 12 mm diameter with inbuilt set screw. (2) should be capable of allowing cannulated screw or blade (one) with same hole in proximal part. (3) end of blade and screw should be porous to allow augmentation with 5 mm distal locking option (two). (4) material should be titanium molybdenum. (complete range of size shape and side specific implant with instrumentation should be available at the time of surgery).[ item code no.:s6155
Read moreGrooved rubber profile for safety strap of retention tank as per drawing no. icf/sk3-6-3-201 alt.-nil. note- length of each unit should be 3370 mm + - 10 mm.
Grooved rubber profile for safety strap of retention tank as per drawing no. icf/sk3-6-3-201 alt.-nil. note- length of each unit should be 3370 mm + - 10 mm.
Read moreGrooved rubber profile for safety strap of retention tank as per drawing-no. icf/sk3-6-3-201 alt.-nil. the rubber profile should be supplied in length of 2.00 meter.
Grooved rubber profile for safety strap of retention tank as per drawing-no. icf/sk3-6-3-201 alt.-nil. the rubber profile should be supplied in length of 2.00 meter.
Read moreWork involves construction of a store building and septic tank, including earthwork, cc, rcc, brickwork, plastering, damp-proof course and reinforcement. all materials, including cement, ms bars and bricks, shall be supplied by the contractor.
Work involves construction of a store building and septic tank, including earthwork, cc, rcc, brickwork, plastering, damp-proof course and reinforcement. all materials, including cement, ms bars and bricks, shall be supplied by the contractor.
Read moreof your Industry type