Tender Details

Particulars Details
Title
Monthly Basis Cab & Taxi Hiring Services Sedan; 3500 Km X 320 Hours; Local 24*7
Description
Organisation Department of Scientific and Industrial Research (DSIR) | Ministry of Science and Technology
Tender Id GEM/2023/B/4045727
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date October 05, 2023 22:17
End Date
Expired 19/10/2023

Expired 1088 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: cancelled
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Buyer Name: Gaurav Singh Bisht
Ministry: Ministry Of Science And Technology
Department: Department Of Scientific And Industrial Research (dsir)
Organisation: Central Electronics Limited

Technical Evaluation Results

S.No. Seller Name Participated On MSE/MII Status Status
1 ABEONA TRANSPORT AGENCY 19-10-2023 00:51:57 MSE Disqualified
2 HARGOBIND SAHIB TAXI SERVICE 19-10-2023 14:28:07 MSE Qualified
3 hindon enterprises 09-10-2023 00:44:25 MSE Disqualified
4 Karthik Motors & Car Rental Services 11-10-2023 19:13:15 MSE Disqualified
5 RAHUL ASSOCIATES 10-10-2023 14:26:50 MSE Qualified
6 SAI TOUR & TRAVELS 09-10-2023 21:20:44 MSE Qualified
7 WISE TRAVEL INDIA LIMITED 19-10-2023 15:31:55 MSE Qualified
Similar Tenders
Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-470/19/a, 13-3-506/320/108/10/1, 13-3-506/320/108, 13-3-506/320/90/1 and 13-3-506/320/63/8 at shivbagh under ward no.138-jiyaguda (reserved for scs)

Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-470/19/a, 13-3-506/320/108/10/1, 13-3-506/320/108, 13-3-506/320/90/1 and 13-3-506/320/63/8 at shivbagh under ward no.138-jiyaguda (reserved for scs)

Read more
Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-506/330/121, 13-3-506/320/121/46 and 13-3-506/320/12/1 at imampura under ward no.138-jiyaguda, karwan circle-31, gz, ghmc.

Restoration of damaged cc road by laying new cc road proposed from h.no.13-3-506/330/121, 13-3-506/320/121/46 and 13-3-506/320/12/1 at imampura under ward no.138-jiyaguda, karwan circle-31, gz, ghmc.

Read more
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.

Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.

Read more
Laying of cc road in place of badly damaged road from h.no.13-3-506/320/130 to 13-3-506/320/127 at valmiki basthi, from h.no.13-3-690/71/1 to ranganatha nagar and from h.no.13-3-1050/2/d, 13-3-1050/4/d and 13-3-1050/a at navodaya nagar under ward no.138-jiyaguda, karwan circle-31, gz, ghmc.

Laying of cc road in place of badly damaged road from h.no.13-3-506/320/130 to 13-3-506/320/127 at valmiki basthi, from h.no.13-3-690/71/1 to ranganatha nagar and from h.no.13-3-1050/2/d, 13-3-1050/4/d and 13-3-1050/a at navodaya nagar under ward no.138-jiyaguda, karwan circle-31, gz, ghmc.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.

Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.

Read more
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.

Read more
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar

Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise