Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Variable Capacitance Meter
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2023/B/3874283 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 25, 2023 19:46 |
| End Date |
Expired
15/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
33kv ht tvr net meter -/1a dlms cat-c 0.2s class
33kv ht tvr net meter -/1a dlms cat-c 0.2s class
Read moreCconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.
Cconstruction of 20 nos. 125mm x 40mm dia x 61 meter deep and 10 nos. 125mm x 48 meter deep / hand operated t/well with india mark ii hand pump with plateform,drain and soakpit in place of old defuct/ordinary hand pumps in the water scarce area under p.h.division, biharsharif for the year 2026-27.
Read moreOperation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreSupply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) im
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) image processing:- auto rebar spacing first rebar layer neighboring rebar correction first layer neighboring rebar correction second layer, (iii) display settings:- concrete cover threshold slider with color palette, (iv) reporting:- instant report generation jpg (screenshot), (v) display unit specs:- screen size: from 7.9 inch to 12.9 inch, resolution : up to 2732-by-2048, memory: up to 02 tb, weight: down to 301 gm/10.6 oz, camera: up to 12 mp wide and 10 mp ultra wide, optional: usb-c, 5g, face id, (vi) display unit sensors:- three – axis gyro, accelerometer, ambient light sensor barometer built -in- gps/gnss (2) instrument. technical specifications:- (i) technology:- eddy-current, (ii) connection:- wireless, (iii) cover measuring depth:- up to 185 mm/7.3in, (iv) cover measuring accuracy:- +/-1 mm/ 0.04 in to 4 mm/ 0.16 in depending on depth , (v) rebar diameter measuring depth:- up to 63 mm/2.5 in, (vi) rebar diameter measuring accuracy:- +/-1 rebar size (possible under optimal conditions. please refer to the manual), (vii) encoder accuracy:- +/-0.5 mm/0.02 in +0.05% of measured length, (viii) max scanning speed:- 0.5 m/s – 1.7 ft/s, (ix) max line scan distance:- 1 km/ 0.6 miles, (x) display:- high-contrast loed screen, (xi) dimensions:-250x130x45 mm / 9.8x5.1x1.8 in (with cart), 190x75x45 mm / 7.5x3.0x1.8 in (without cart) (xii) weight:- 690 gm/ 1.5 ib (with cart), 300 gm / 0.7 ib (without cart), (xiii) battery:- 2x aa(nimh) rechargeable or non rechargeable removable flight-safe, 8 hours autonomy, usb-c power bank (not included)
Read moreof your Industry type