Tender Details

Particulars Details
Title
Improvement Of Reliability For Ohe/Psi Infrastructure Along With Strengthening Of Ohe Through Stone Pitching, Soil Filling In Connection With Safety In Bza Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 83798132
Reference
Number
B-E29-TRD-TNDR-21-2025-26
Tender Fee 0
EMD 3.46 Lakh
Tender Value -
Place Secunderabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/092025/83798132/viewNitPdf_5082742.pdf

Start Date August 21, 2025 23:40
End Date
Expired 12/09/2025

Expired 396 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.

Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.

Read more
In danghar ward work of laying new drain on one side partial soil filling interlocking and steel bench installastion iron gate open gym partial kota stone in danghar park.

In danghar ward work of laying new drain on one side partial soil filling interlocking and steel bench installastion iron gate open gym partial kota stone in danghar park.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Stone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles

Stone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles

Read more
Strengthening of the sambamurthy ss tank bund with gravel and stone pitching in kmc.

Strengthening of the sambamurthy ss tank bund with gravel and stone pitching in kmc.

Read more
Repair to stone/brick masonry toe wall dwarf wall nat/vift and traverses stone pitching and earth filling at afs amla

Repair to stone/brick masonry toe wall dwarf wall nat/vift and traverses stone pitching and earth filling at afs amla

Read more
Construction of remening stone pitching work for proctecting soil enosion on both side at court road saharanpur

Construction of remening stone pitching work for proctecting soil enosion on both side at court road saharanpur

Read more
Construction of remening stone pitching work for proctecting soil enosion on both side at court road saharanpur

Construction of remening stone pitching work for proctecting soil enosion on both side at court road saharanpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise