Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrical Work For Construction Of Additional High Level Pf No.2 At Barkipona Stn &Amp Construction Of Fob At Barkipona Stn.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77348541 |
|
Reference Number |
EL-G-RNC-OT-BRKP-24 |
| Tender Fee | 0 |
| EMD | 11200 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77348541/viewNitPdf_4711180.pdf |
| Start Date | September 12, 2024 17:32 |
| End Date |
Expired
03/10/2024
Expired 745 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Raising of existing rail level pf to high level pf and foundation and civil work of fob at bahjoi and dibai station under aden/ch
Raising of existing rail level pf to high level pf and foundation and civil work of fob at bahjoi and dibai station under aden/ch
Read moreProvision of high level pf high level (pf 02 & 03-length =580m & width= 10.5m) at tur and (pf- 02 length =505m & width =4m) at gwh.
Provision of high level pf high level (pf 02 & 03-length =580m & width= 10.5m) at tur and (pf- 02 length =505m & width =4m) at gwh.
Read moreRajkot division : allied work of (a) provision of escalators pairs of 12 m wide fob at rajkot, (b) provision of single escalators for pf 1, pf 2/3 and pf 4/5 at rajkot, for pf 1 and pf 2 at jamnagar & (c) lift 12 m wide fob at rajkot & jamnagar
Rajkot division : allied work of (a) provision of escalators pairs of 12 m wide fob at rajkot, (b) provision of single escalators for pf 1, pf 2/3 and pf 4/5 at rajkot, for pf 1 and pf 2 at jamnagar & (c) lift 12 m wide fob at rajkot & jamnagar
Read more(1)at hmy - (i) electrical works in connection with extension of high level pf-1, (ii) raising and extension of medium level pf- 2&3 to high level platform.(2)at gpz - (i)electrical works in connection with extension of high level pf-1, (ii) raising and extension of medium level pf- 2 to high level platform.(3)at vne - electrical works in connection with raising and extension of medium level pf- 2 to high level platform.
(1)at hmy - (i) electrical works in connection with extension of high level pf-1, (ii) raising and extension of medium level pf- 2&3 to high level platform.(2)at gpz - (i)electrical works in connection with extension of high level pf-1, (ii) raising and extension of medium level pf- 2 to high level platform.(3)at vne - electrical works in connection with raising and extension of medium level pf- 2 to high level platform.
Read moreRaising of medium level pf no. 1 at gajsinghpur over bikaner division along with extension from 495 m to 580 m & 3 m wide fob under aden/hanumangarh-ii
Raising of medium level pf no. 1 at gajsinghpur over bikaner division along with extension from 495 m to 580 m & 3 m wide fob under aden/hanumangarh-ii
Read moreOhe work in c/w proposed pf raising (pf-1, 2) & fob (6 mtr wide) at srgh, nwh, dob station; pf extension at jjn station in sikr-lhu section of jaipur division.
Ohe work in c/w proposed pf raising (pf-1, 2) & fob (6 mtr wide) at srgh, nwh, dob station; pf extension at jjn station in sikr-lhu section of jaipur division.
Read moreOhe work in c/w proposed pf raising (pf-1, 2) of rsh, crwa, nua, bwpl, botr, nrke station; pf extension at crwa station & fob (6 mtr wide) at rsh station of jaipur division.
Ohe work in c/w proposed pf raising (pf-1, 2) of rsh, crwa, nua, bwpl, botr, nrke station; pf extension at crwa station & fob (6 mtr wide) at rsh station of jaipur division.
Read moreOhe work in c/w proposed pf raising (pf-1, 2) of lnh, bub, rswt, mwr station; pf extension at lnh, fps station & fob (6 mtr wide) at lnh, bub, rswt station of jaipur division.
Ohe work in c/w proposed pf raising (pf-1, 2) of lnh, bub, rswt, mwr station; pf extension at lnh, fps station & fob (6 mtr wide) at lnh, bub, rswt station of jaipur division.
Read moreConstruction of platform no-02(h.l) and fob connection between pf-1 and pf-2 at bilaspur road in jurisdiction of aden/kpv in izzatnagar division of n.e.railway.
Construction of platform no-02(h.l) and fob connection between pf-1 and pf-2 at bilaspur road in jurisdiction of aden/kpv in izzatnagar division of n.e.railway.
Read moreSecunderabad division electrical maintenance department - (i) oea-development -development of odela railway station with facilities of nsg-4 category (ii) oea-fob - ramp - proposal for contraction of 2.4 m wide ramp at existing fob at odela station (iii) asaf-srur pf - raising of platform from medium level to high level at asaf (pf1) & srur(pf3) in sr.den/north jurisdiction (iv) rechini road - raising of platform no 1 from ml to hl pf at rech in sr.den/north jurisdiction. & proposed
Secunderabad division electrical maintenance department - (i) oea-development -development of odela railway station with facilities of nsg-4 category (ii) oea-fob - ramp - proposal for contraction of 2.4 m wide ramp at existing fob at odela station (iii) asaf-srur pf - raising of platform from medium level to high level at asaf (pf1) & srur(pf3) in sr.den/north jurisdiction (iv) rechini road - raising of platform no 1 from ml to hl pf at rech in sr.den/north jurisdiction. & proposed
Read moreof your Industry type