Tender Details
Particulars | Details |
---|---|
Title |
Repairing/Changing Of Base Mounted Gear Box And Motor To Wall Mounted To Drive Primary Crusher Roller And Repairing Of Secondary Crusher Roller Drive System And Its Related Coal Flow Mother Plate Of Bwf Make Feeder Braker No 05 Installed At Tarmi Si
|
Description |
Repairing/Changing Of Base Mounted Gear Box And Motor To Wall Mounted To Drive Primary Crusher Roller And Repairing Of Secondary Crusher Roller Drive System And Its Related Coal Flow Mother Plate Of Bwf Make Feeder Braker No 05 Installed At Tarmi Sid
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_331210_6 |
Reference Number |
SDOCM/PE(EnM)/e.NIT/24-25/24 dt.04.03.2025 |
Tender Fee | 0 |
EMD | 5800 |
Tender Value | |
Place | SDOCM |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343307 |
Start Date | March 05, 2025 16:30 |
End Date |
16/03/2025 ( Expired 36 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Repairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Read moreRepairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Repairing of coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of bwf make feeder breaker installed at tarmi siding in r/o sdocm project
Read moreStrengthening of base-frame, realignment of crusher roller motor (160kw) with gearbox, repairing of shear hub and plumber block of atlas copco make feeder breaker (local sl no. 02) installed at tarmi siding under sdocm project.
Strengthening of base-frame, realignment of crusher roller
 motor (160kw) with gearbox, repairing of shear hub and plumber block of atlas copco make feeder breaker (local sl no. 02) installed at tarmi siding under sdocm project.
Read moreRepairing of top and bottom mother plate, side hopper plate, moving plate, coal receiving plate of hopper for b.w.f make feeder breaker (local sl no. 05) installed at tarmi siding in r/o sdocm project.
Repairing of top and bottom mother plate, side hopper plate, moving plate, coal receiving plate of hopper for b.w.f make feeder breaker (local sl no. 05) installed at tarmi siding in r/o sdocm project.
Read moreRepairing/changing of base mounted gear box and motor to wall mounted to drive primary crusher roller and repairing of secondary crusher roller drive system and its related coal flow mother plate of bwf make feeder braker no-05 installed at tarmi si
Repairing/changing of base mounted gear box and motor to wall mounted to drive primary crusher roller and repairing of secondary crusher roller drive system and its related coal flow mother plate of bwf make feeder braker no-05 installed at tarmi sid
Read moreDismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Dismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Read moreDismantling, repairing and replacement of bearing and intermediate pinion of gear box (model gs-100) installed at drive end along with alignment of drive drum of unit 801-a and c-1 conveyor belt at moonidih coal washery.
Dismantling, repairing and replacement of bearing and intermediate pinion of gear box (model gs-100) installed at drive end along with alignment of drive drum of unit 801-a and c-1 conveyor belt at moonidih coal washery.
Read moreRepairing of coal receiving plate of mainframe hopper of i.r make (local sl no. 01) and a.c make (local sl no. 02), feeder breaker installed at tarmi siding under sdocm project.
Repairing of coal receiving plate of mainframe hopper of i.r make (local sl no. 01) and a.c make (local sl no. 02), feeder breaker installed at tarmi siding under sdocm project.
Read moreRepairing of secondary crusher roller deflector plate coal discharge plate chand making etc. of black diamond make feeder breaker (local sl. no.04 ) in stalled at tarmi siding in r/o sdocm.
Repairing of secondary crusher roller deflector plate coal discharge plate chand making etc. of black diamond make feeder breaker (local sl. no.04 ) in stalled at tarmi siding in r/o sdocm.
Read more(a) gear coupling replacing of drive head drum/conveyor belt system of fb no-1 and (b) high speed coupling changing of crusher gear box of feeder breaker no-1 at phularitand section of amp colliery, barora area.
(a) gear coupling replacing of drive head drum/conveyor belt system of fb no-1 and (b) high speed coupling 
 changing of crusher gear box of feeder breaker no-1 at phularitand section of amp colliery, barora area.
Read moreof your Industry type