Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Damaged Hdpe Water Main Pipes With Di Pipes At Astalakshmi Nagar (Phase Ii) In Depot 147, Area Xi.
|
Description |
Replacement Of Damaged Hdpe Water Main Pipes With Di Pipes At Astalakshmi Nagar (Phase Ii) In Depot 147, Area Xi.
|
Organisation | CMWSS Board | State Govt. and UT |
Tender Id | 2025_CMWSS_558023_1 |
Reference Number |
CNT/WSS/MWB/3666/2025-26 |
Tender Fee | 0 |
EMD | 1.17 Lakh |
Tender Value | |
Place | chennai |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=666473 |
Start Date | May 27, 2025 20:30 |
End Date |
03/06/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreFeasibility study and preparation of detailed project report for place making and beautification at broken bridge area in adyar
Feasibility study and preparation of detailed project report for place making and beautification at broken bridge area in adyar, area below the mrts line near indira nagar railway station and velachery rail over bridge.
Read moreRepair replacement of unserviceable lightening
Repair replacement of unserviceable lightening 
 protection system flame proof fittings and allied maint works in 
 tech/domestic area at mil stn dappar
Read moreRepair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Repair / replacement and improvement of existing water supply distribution system, replacement of old ci / di pipeline and other connected items at nad pump house, navy nagar area, nofra area at naval station karanja
Read moreRepair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja
Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreSpecial repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Special repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Read moreCa no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Ca no.cwe blyge e 09 of 20252026spl repair to bldg no p-151, p-152, p-344 incl water through in a charge and bldg no p-337 water through in b charge at rts and depot hempur under ge (east) bareilly
Read moreCa no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Ca no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type