Tender Details
Particulars | Details |
---|---|
Title |
Estimate For 02 Km 11 Kv Line Interconnection For Ikodiya Pump Feeder From Malukhedi To Jasankhedi Village Under Bahadurpur Dc Under Mungaoli Division
|
Description |
Estimate For 02 Km 11 Kv Line Interconnection For Ikodiya Pump Feeder From Malukhedi To Jasankhedi Village Under Bahadurpur Dc Under Mungaoli Division
|
Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 885 |
EMD | 6652 |
Tender Value | |
Place | OFFICE OF THE DGM STC-STM MPMKVVCL ASHOKNAGAR |
Link |
AAAAAAAAAA Login to view |
Start Date | March 29, 2025 15:30 |
End Date |
22/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreAAAAAAAAAA
Login to viewGap filling with hdpe pipe line raigaon jharna and repairing of damaged pipe line during construction of drain installation of valve and other allied works for zi to zv under jaigaon development authority jda under alipurduar division phe dte.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreof your Industry type