Tender Details
Particulars | Details |
---|---|
Title |
Engaging Separate Agency For Part Duct Work From Buf To Absorber Inlet For Unit 4 Stage Ii At 3 X200 Mw 3 X500 Mw Ntpc Ramagundam Stage I And Ii, Fgd Package
|
Description |
Engaging Separate Agency For Part Duct Work From Buf To Absorber Inlet For Unit 4 Stage Ii At 3 X200 Mw 3 X500 Mw Ntpc Ramagundam Stage I And Ii, Fgd Package
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id | 2024_BHEL_40832_1 |
Reference Number |
BHE/PW/PUR/RGFGD/Duct/011 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | 3X200MW 3X500MW FGD Jyothinagar, Ramagundam |
Link | https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=42566 |
Start Date | October 14, 2024 18:30 |
End Date |
22/10/2024 ( Expired 204 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual work contract for assistance in day to day work of testing division-ii of unit no. -3 and 4, 2x210mw, at sgtps, mppgcl, birsinghpur.
Annual work contract for assistance in day to day work of testing division-ii of unit no. -3 and 4, 2x210mw, at sgtps, mppgcl, birsinghpur.
Read moreMtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Mtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreWork contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Work contract for repair and replacement of damaged top pipe railing, platforms and ladders of cooling tower stage i and ii at ghtp lehra mohabat
Read moreAnnual contract for routine, breakdown and capital maintenance work of effluent treatment plant and all connected effluent supply pits and upkeep the area of unit 1 to 4, 4x250 mw chhabra thermal power project, stage-i, chhabra
Annual contract for routine, breakdown and capital maintenance work of effluent treatment plant and all connected effluent supply pits and upkeep the area of unit 1 to 4, 4x250 mw chhabra thermal power project, stage-i, chhabra
Read moreMtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Read moreProcurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Procurement of expansion joint between economizer outlet to air pre heater inlet damper for unit i and ii
Read morePackage-i for kps3-south olpad hvdc
Prebid tie up for package for establishment of 500 kv, 2500mw hvdc terminals at khavda pooling station-3 (kps3) (hvdc) and south olpad (hvdc) associated with transmission system for evacuation of power from potential renewable energy zone in khavda area of gujarat under phase v (8 gw) part c through tariff based competitive bidding (tbcb) route prior to rfp bid submission by powergrid to bpc
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreEngaging m/s. bhel to provide technical assistance for m and i- s/d inspection, trouble shooting of m/s. bhel make motor driven inert gas compressor 9k501b in mek dewaxing unit (plant 9) at cpcl manali
Engaging m/s. bhel to provide technical assistance for m and i- s/d inspection, trouble shooting of m/s. bhel make motor driven inert gas compressor 9k501b in mek dewaxing unit (plant 9) at cpcl manali
Read moreof your Industry type