Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engaging Agency For Preparation Of Scaffolding Arrangements For Fgd Absorber
|
| Description |
Engaging Agency For Preparation Of Scaffolding Arrangements For Fgd Absorber
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2025_BHEL_51268_1 |
|
Reference Number |
BHE/PW/PUR/RGFGD/SCAFFOLD/025 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | 3X200MW 3X500MW FGD Jyothinagar, Ramagundam |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=55172 |
| Start Date | July 30, 2025 18:30 |
| End Date |
Expired
06/08/2025
Expired 435 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Read moreEngaging and providing necessary arrangements on hire basis for celebration of bathukamma festival under narayankhed municipality under mgf
Engaging and providing necessary arrangements on hire basis for celebration of bathukamma festival under narayankhed municipality under mgf
Read moreDismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreE-tender for preparation of detailed project report (dpr) for identified priority projects under upcoming watershed development component-pmksy (wdc-pmksy 3.0) scheme in west bengal
E-tender for preparation of detailed project report (dpr) for identified priority projects under upcoming watershed development component-pmksy (wdc-pmksy 3.0) scheme in west bengal
Read moreEngaging of casual labours for assisting the field officer in the electrical works in connection with providing 1 no 24 body cold storage unit with necessary power mains arrangements in tirunelveli medical college hospital at tirunelveli in tirunel
Engaging of casual labours for assisting the field officer in the electrical works in connection with providing 1 no 24 body cold storage unit with necessary power mains arrangements in tirunelveli medical college hospital at tirunelveli in tirunel
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreChairs,sofa 02 seater,konark wheel,3d illuminated acrylic letter signage,curtains,3d illuminated acrylic letter signage,digital audio mixer,column array speaker,class d power amplifier,uhf wireless handheld microphone system,transportation integration documentation and handover,refurbishment of existing 8 bathroom walls including surface preparation,premium floral and foliage arrangements decorative 3-5 ft assorted table,decorative table centerpieces and vases decorative 10-24 in height assorted,customized backdrop and fabric draping decorative backdrop approx- 10x8 ft,decorative artificial plants and greenery decorative 2-6 ft assorted height,decorative signage, props and display and display accessories consumable,application and installation of modified drain cover metallic frame
Chairs,sofa 02 seater,konark wheel,3d illuminated acrylic letter signage,curtains,3d illuminated acrylic letter signage,digital audio mixer,column array speaker,class d power amplifier,uhf wireless handheld microphone system,transportation integration documentation and handover,refurbishment of existing 8 bathroom walls including surface preparation,premium floral and foliage arrangements decorative 3-5 ft assorted table,decorative table centerpieces and vases decorative 10-24 in height assorted,customized backdrop and fabric draping decorative backdrop approx- 10x8 ft,decorative artificial plants and greenery decorative 2-6 ft assorted height,decorative signage, props and display and display accessories consumable,application and installation of modified drain cover metallic frame
Read moreHiring ms scaffolding pipes on monthly rental basis for fgd absorber
Hiring ms scaffolding pipes on monthly rental basis for fgd absorber
Read moreEngaging agency for the welding of unit-4 stage-ii absorber at fgd project
Engaging agency for the welding of unit-4 stage-ii absorber at fgd project
Read moreEngaging scaffolding specialist
Engaging scaffolding specialist
 at ntecl vallur tpp (3x500 mw)
Read moreof your Industry type