Tender Details
About Tender
🏭 Construction And Commissioning Of Tube Wells And Submersible Pump Sets 🏭 The Public Health And Engineering Department (Phed) C.E. (Project), Jodhpur, Invites Bids From Experienced Contractors For The Construction And Commissioning Of All Types Of Tube Wells (Dth, Combination, And Rotary) Along With The Supply And Installation Of Submersible Pump Sets. This Project Includes A 2 Year Defect Liability Period And Is Located In The District Sub Division Jalore, Division Jalore. 📅 Bid Submission Deadline: May 20, 2024, 6:00 Pm Tender Fee: Inr 5000 Earnest Money Deposit (Emd): Inr 240000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Timeline For Project Completion, Adhering To The Guidelines Provided In The Tender Document. Keywords: Construction, Tube Wells, Submersible Pump Sets, Phed, Jalore, Government Tender, Water Supply Project, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Water Supply Scheme For Augmentation Of Uwss Sanchore District Sanchore Including 05 Years O And M After 01 Year Defect Liability Period Under Amrut 2
|
Description |
Water Supply Scheme For Augmentation Of Uwss Sanchore District Sanchore Including 05 Years O And M After 01 Year Defect Liability Period Under Amrut 2 &Amp#X0d
&Amp#X0d
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2024_PHCJA_389936_1 |
Reference Number |
NIT No 02/2024-25 |
Tender Fee | 27500 |
EMD | 1.03 Crore |
Tender Value | |
Place | PALI |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787719 |
Start Date | December 30, 2024 20:30 |
End Date |
30/01/2025 ( Expired 129 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreAugmentation of water supply system of gwalior municipal corporation under amrut 2.0 file 01/25x9/1
Augmentation of water supply system of gwalior municipal corporation under amrut 2.0 file 01/25x9/1
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type