Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
B.T. Renewal Nimbola Bori Khurd Road Km 1/2 To 3/4 Total 2.45 Km
|
| Description |
B.T. Renewal Nimbola Bori Khurd Road Km 1/2 To 3/4 Total 2.45 Km
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_284278_1 |
|
Reference Number |
14/SAC/2023-24/BPUR/15-06-2023 |
| Tender Fee | 2000 |
| EMD | 37380 |
| Tender Value | |
| Place | E.E. PWD Division Burhanpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 16, 2023 15:30 |
| End Date |
Expired
24/06/2023
Expired 1079 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 1.mohjhari to chikhlamali road length 1.80 km 2. matkatola to wara road length 1.80 km
Construction of 1.mohjhari to chikhlamali road length 1.80 km&#x0d 2. matkatola to wara road length 1.80 km
Read moreConstruction of 1.sihari to dighori road length 3.00 km 2. kalimati thanegaon road length 3.00 km
Construction of 1.sihari to dighori road length 3.00 km&#x0d 2. kalimati thanegaon road length 3.00 km
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreRenewal of main road by sdbc from nh-74 gaindikhata to gujjar basti in constituency haridwar gradistt. haridwar under ar 2026-27 (km. 1 to 7 (800m))
Renewal of main road by sdbc from nh-74 gaindikhata to gujjar basti in constituency haridwar gradistt. haridwar under ar 2026-27 (km. 1 to 7 (800m))
Read moreRemaining work on sh-21a to palri kallan via bikharniya kallan road km 9/350 to to 9/710 (bikharniya khurd) and 13/615 to 13/940 (chhabasar) including approach roads
Remaining work on sh-21a to palri kallan via bikharniya kallan road km 9/350 to to 9/710 (bikharniya khurd) and 13/615 to 13/940 (chhabasar) including approach roads
Read moreExtending and lowering of ms pipe 80mm and 100mm and submersible cable at twell no. s 15 t 1 t 2 t 3 t 4 in sector 3 panchkula
Extending and lowering of ms pipe 80mm and 100mm and submersible cable at twell&#x0d no. s 15 t 1 t 2 t 3 t 4 in sector 3 panchkula
Read moreConstruction of c.c. road in w.n. 18 1) kamla bai to dhanna lal 2) suresh kumar to radheshyam dhangar 3) rajesh jaiswal to shivhare biaora
Construction of c.c. road in w.n. 18 1) kamla bai to dhanna lal 2) suresh kumar to radheshyam dhangar 3) rajesh jaiswal to shivhare biaora
Read moreConstruction of c.c. road in w.n. 18 1) narayan singh prajapati to mahendra ji 2) suresh bhilala to mahendra ji 3) prem verma to vanskar biaora
Construction of c.c. road in w.n. 18 1) narayan singh prajapati to mahendra ji 2) suresh bhilala to mahendra ji 3) prem verma to vanskar biaora
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreConstruction of c.c. road in w.n. 18 1) vinod prajapati wali gully 2) kamlesh sahu se bade kuye tak 3) gully no 1 me sagar khatik se bhargav biaora
Construction of c.c. road in w.n. 18 1) vinod prajapati wali gully 2) kamlesh sahu se bade kuye tak 3) gully no 1 me sagar khatik se bhargav biaora
Read moreof your Industry type