Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation Of Old Water Treatment Plant (Wtp) Of 4.50 Mld Capacity At Parwaripura Filter
|
| Description |
Rehabilitation Of Old Water Treatment Plant (Wtp) Of 4.50 Mld Capacity At Parwaripura Filter
|
| Organisation | Directorate of Local Bos UP | State Govt. and UT |
| Tender Id | 2026_DOLBU_1141344_1 |
|
Reference Number |
755/etender158/16 |
| Tender Fee | 3540 |
| EMD | 17000 |
| Tender Value | - |
| Place | jhansi |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2131553 |
| Start Date | April 25, 2026 17:00 |
| End Date |
Expired
05/05/2026
Expired 163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
State plan 2025 26 cwss to chavara panmana replacement of filter bed in 11.5 mld water treatment plant and paving tiles inside the filter bed at wtp sasthamcotta
State plan 2025 26 cwss to chavara panmana replacement of filter bed in 11.5 mld water treatment plant and paving tiles inside the filter bed at wtp sasthamcotta
Read moreState plantwss head works at peechi renovation of 36 mld wtp replacing filter media strengthening filter house truss work and painting of 36mld water treatment plant at peechi general civil work
State plantwss head works at peechi renovation of 36 mld wtp replacing filter media strengthening filter house truss work and painting of 36mld water treatment plant at peechi general civil work
Read moreRehabilitation of 50 mld sewerage treatment plant at bast peer dad
Rehabilitation of 50 mld sewerage treatment plant at bast peer dad
Read moreInstallation of new water filter in water treatment plant
Installation of new water filter iorn mesh and carbon in water treatment plant at hospital
Read moreHarticulture work at ward no. 01 old filter plant.
Harticulture work at ward no. 01 old filter plant.
Read moreReverse osmosis based water treatment system above 50 lph capacity (v2)
Reverse osmosis based water treatment system above 50 lph capacity (v2)
Read moreReverse osmosis based water treatment system above 50 lph capacity (v2)
Reverse osmosis based water treatment system above 50 lph capacity (v2)
Read moreReverse osmosis based water treatment system above 50 lph capacity (v2)
Reverse osmosis based water treatment system above 50 lph capacity (v2)
Read moreReverse osmosis based water treatment system above 50 lph capacity (v2)
Reverse osmosis based water treatment system above 50 lph capacity (v2)
Read moreReverse osmosis based water treatment system above 50 lph capacity (v2)
Reverse osmosis based water treatment system above 50 lph capacity (v2)
Read moreof your Industry type