Tender Details
Particulars | Details |
---|---|
Title |
Const Of Link Road From Paplehra To Sc Bandhan Mohalla In Gp Duhal Bangwala Km 000 To 1000 Sh Const Of Cement Concrete Pavement Between Rd 000 To 0250 And Const Of Retaining Wall Rd 0150 To 0170) Under Mnp
|
Description |
Const Of Link Road From Paplehra To Sc Bandhan Mohalla In Gp Duhal Bangwala Km 000 To 1000 Sh Const Of Cement Concrete Pavement Between Rd 000 To 0250 And Const Of Retaining Wall Rd 0150 To 0170) Under Mnp
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_98466_1 |
Reference Number |
Paplehra to SC Badhan Job No. 6 |
Tender Fee | 500 |
EMD | 28300 |
Tender Value | |
Place | Bharwain |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=144744 |
Start Date | January 22, 2025 14:30 |
End Date |
27/01/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConst of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan to nathana via seema poohli at rd 8.70 km inc appr road diversion dismantling 2.5 m high rcc retaining wall etc pmgsyiii batch i pac no pb02 047
Const of hl bridge single span steel truss 36.00 each eff over sirhind canal xing bhucho kalan
 to nathana via seema poohli at rd 8.70 km inc appr. road diversion dismantling and 2.5 m high rcc retaining wall etc pmgsyiii batch-i pac no pb-02 047 
Read moreConstruction of retaining wall near the land of yudhvir singh son of bal singh village manoh gp manoh sihal under mlalad deposit work sh construction of edge wall from rd 0.0 to 0.025
Construction of retaining wall near the land of yudhvir singh son of bal singh village manoh gp manoh sihal under mlalad deposit work sh construction of edge wall from rd 0.0 to 0.025
Read moreConstruction of ambulance road to jhikli bhaladu, harijan basti kuther km. 0/0 to 0/675 in g.p. kuther (under deposit).
Construction of edge wall at various reaches and providing and laying cement concrete pavement at rd. 0/575 to 0/600).
Read moreMetalling of ambulance road and construction of rcc retaining walls along side this road in village nain gp luharwin sh c/o r/wall at rd 0/00 to 0/024
Metalling of ambulance road and construction of rcc retaining walls along side this road in village nain gp luharwin sh c/o r/wall at rd 0/00 to 0/024
Read moreJob 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u
Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u
Read moreJob 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u
Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u
Read moreRestoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)
Restoration of rain damages on badehar khui pekhubela road km.0.0 to 3.600 (sh c.o retaining wall in rd.2.400 to 2.450 lhs earthern shoulder in rd.0.500 to 2.0 both side ) (dc deposit work)
Read moreRe-construction of nadaun sujanpur road km 0/00 to 14/600
C/o r/wall at rd 9/550 to 9/585, 9/900 to 9/938, 9/500 to 9/525 b/wall at rd 8/110 to 8/825 c/o v-shape drain in km 2/555 to 2/340 p/l cement concrete pavement at rd 2/255 to 2/340 ) (under demand no 10 5054-307-02) (otmnp head)
Read moreof your Industry type