Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
8979/Gwl/E8 Provn Of 150 Mtr Black Top Road Near Sports Ground At Gwalior Cantt
|
Description |
8979/Gwl/E8 Provn Of 150 Mtr Black Top Road Near Sports Ground At Gwalior Cantt
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id | 2024_MES_672379_1 |
Reference Number |
8979/GWL/E8 |
Tender Fee | 500 |
EMD | 28120 |
Tender Value | |
Place | Garrison Engineer Gwalior |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=751715 |
Start Date | September 20, 2024 14:30 |
End Date |
26/09/2024 ( Expired 272 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreConstruction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Read moreProvn of lab at kv no-01 delhi cantt-10 under ge (west) delhi cantt-10
Provn of lab at kv no-01 delhi cantt-10 under ge (west) delhi cantt-10
Read moreProvn of retrofit emission control equipments device recd for dg sets installed at various location at ahrr under ge em rr hosp delhi cantt-10
Provn of retrofit emission control equipments device recd for dg sets installed at various location at ahrr under ge em rr hosp delhi cantt-10
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreConstruction of pcc road at ward no 39 near ayesha masjid
Construction of pcc road at ward no 39 near ayesha masjid
Read moreCa no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Ca no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreProvn of roof top solar plant totalling 750 kw at certain building at nasirabad
Provn of roof top solar plant totalling 750 kw at certain building at nasirabad
Read moreDesign and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang metaliang chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang-metaliang-chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Read moreof your Industry type