Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
20 K Wp On Grid Solar Pv System Or Plant,Iron Work, Sheet Metal Work,Making Cement Concrete Foundati
|
| Description |
|
| Organisation | Urban Development Department | |
| Tender Id | GEM/2024/B/4737015 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 05, 2024 21:05 |
| End Date |
Expired
15/03/2024
Expired 946 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AAROHI ENTERPRISES | - | 13-03-2024 17:28:40 | N/A | Qualified |
| 2 | DHRUP ELECTRICALS | - | 13-03-2024 16:48:25 | MSE | Qualified |
| 3 | R K ELECTRICAL SERVICES | - | 13-03-2024 17:11:12 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | DHRUP ELECTRICALS( MSE Social Category:OBC ) | Item Categories : 20 kWp ON-GRID Solar PV System or plant,Iron work, sheet metal work,Making cement concrete foundati | 1621979.80 | L1 |
| 2 | AAROHI ENTERPRISES | Item Categories : 20 kWp ON-GRID Solar PV System or plant,Iron work, sheet metal work,Making cement concrete foundati | 1646497.00 | L2 |
| 3 | R K ELECTRICAL SERVICES | Item Categories : 20 kWp ON-GRID Solar PV System or plant,Iron work, sheet metal work,Making cement concrete foundati | 1646497.00 | L2 |
Installation of 150 kwp grid-connected rooftop solar pv systems and 70 kwp carport-type solar pv systems along with 3 nos. of 10 kwp grid-connected solar pv trees (total 30 kwp) at sri sri madhabdev kalakhetra, narayanpur, assam
Installation of 150 kwp grid-connected rooftop solar pv systems and 70 kwp carport-type solar pv systems along with 3 nos. of 10 kwp grid-connected solar pv trees (total 30 kwp) at sri sri madhabdev kalakhetra, narayanpur, assam
Read moreFiber sheet,iron pole,iron flat bar,cement,sand gravel,screw
Fiber sheet,iron pole,iron flat bar,cement,sand gravel,screw
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Read moreConstruction of permanent campus for iit palakkad under phase b, sh: sitc of 1252 kwp solar generation system including solar pv panel, inverter and connection, supporting structures etc. at sahyadri campus
Construction of permanent campus for iit palakkad under phase b, sh: sitc of 1252 kwp solar generation system including solar pv panel, inverter and connection, supporting structures etc. at sahyadri campus
Read moreDesign engineering, manufacture procurement, testing, supply, installation and commissioning of grid connected solar pv power plant of cumulative array capacity 315 kwp at calcutta pavlov hospital, kolkata,
Supply, installation and commissioning of grid connected solar pv power plant of cumulative array capacity 315 kwp at calcutta pavlov hospital, kolkata, west bengal, including 5 years comprehensive maintenance on turkey basis.
Read morePaint rfu black,leather cloth black,metal putty,foam sheet 1 2 inch,sr 998 fevicol,clip,foam sheet 4 inch,angle iron,welding rod,ac gas bottle,iron flat,throttle body spray
Paint rfu black,leather cloth black,metal putty,foam sheet 1 2 inch,sr 998 fevicol,clip,foam sheet 4 inch,angle iron,welding rod,ac gas bottle,iron flat,throttle body spray
Read moreSurvey design fabrication supply installation testing and commissioning of total 39 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 5 years
Survey design fabrication supply installation testing and commissioning of total 39 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 5 years
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Read moreof your Industry type