Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hidco/Gm(e)iv/Rp/Nit52/24 25
|
| Description |
Cleaning Of Drainage Pipe Line Of Canal Bank Road From Bbcc Metro Stn To Dps Pupmping Stn In Aa I New Town, Kolkata
|
| Organisation | WB HIDCO LTD | State Govt. and UT |
| Tender Id | 2024_HIDCO_758482_1 |
|
Reference Number |
HIDCO/GM(E)IV/RP/NIT52/24-25 |
| Tender Fee | 0 |
| EMD | 6236 |
| Tender Value | - |
| Place | NEW TOWN |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1677148 |
| Start Date | September 26, 2024 23:30 |
| End Date |
Expired
05/10/2024
Expired 736 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv
Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.
Read moreTggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Read moreProviding of courier service from gm office,yellandu area to all mines and departments including koyagudem oc mine and kothagudem for a period of 2 years
Providing of courier service from gm office,yellandu area to all mines and departments including koyagudem oc mine and kothagudem for a period of 2 years
Read moreM and r works to 3 and 4 incline quarters, gm office, area workshop, mrs, ctl and old ctc at 3 incline, kothagudem area for the year 2026-27
M and r works to 3 and 4 incline quarters, gm office, area workshop, mrs, ctl and old ctc at 3 incline, kothagudem area for the year 2026-27
Read moreDesign, development, implementation of works module software for all works undertaken by hmwssb (single integrated module) along with training, implementation support and maintenance for a period of two(02) years under gm(it).
Design, development, implementation of works module software for all works undertaken by hmwssb (single integrated module) along with training, implementation support and maintenance for a period of two(02) years under gm(it).
Read moreRequest for proposal (rfp) for printing and supply of teaching learning material for fln-tarl for classes iv to viii at all 38 district headquarters of bihar.
Request for proposal (rfp) for printing and supply of teaching learning material for fln-tarl for classes iv to viii at all 38 district headquarters of bihar.
Read moreTggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreErection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Read moreof your Industry type