Tender Details
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) Phase Iv Wss To Kanakkary, Mulakkulam And Njeezhoor Panchayath (Mulakkulam Package 3)
|
Description |
Construction Of 4 Lakh Litre Ohsr At
Mattappallikkunnu , Laying Distribution Lines And
Providing Fht Cs In Mulakkulam Panchayath
(Package 3) Pipeline Work
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_587973_1 |
Reference Number |
WRD/KWA-CE(SR) /TR/15769/2023_26_1_1/1_1/1 |
Tender Fee | 11025 |
EMD | 2 Lakh |
Tender Value | |
Place | O/o the SE, PHC, KWA Kottayam |
Link | https://etenders.kerala.gov.in |
Start Date | July 14, 2023 23:30 |
End Date |
03/08/2023 ( Expired 652 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Jjm - phase ii - cwss to kunnathoor, poruvazhy, sooranad south panchayaths in kunnathoor taluk and thazhava, thodiyoor, kulasekharapuram panchayaths in karunagappally taluk-clear water transmission main,clear water pumping main from sump at edackadu
Read moreSweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Sweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works
Read morePreparation of detailed project reports for piped water supply scheme under jal jeevan mission to supply drinking water. preparation of estimates and boq etc. complete for (recharge pit)
Preparation of detailed project reports for piped water supply scheme under jal jeevan mission to supply drinking water. preparation of estimates and boq etc. complete for (recharge pit)
Read moreNiet no. - 04 of the fy 2025-2026 of the ee/bqa, phe dte.(sl.no-08)
Creation of balance fhtc (functional house hold tap connection in connection with jal jeevan mission (jjm) for augmentation of salma and adjoining mouzas zone- (i, ii and iii)
Read moreBalance work of jjm scheme
Balance work of piped water supply scheme under jal jeevan mission at village gadhla block karahal distt. sheopur
Read moreBalance work of jjm scheme
Balance work of piped water supply scheme under jal jeevan mission at village kelor (sarsilla) oht 100 kl 15 stageblock karahal distt. sheopur
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreProviding installation testing and commissioning of pumping machinery along with electromechanical components at wss laroka part-ii of jal shakti phe mech division rajouri ut of jk under jal jeevan mission jjm on turnkey basis
Providing installation testing and commissioning of pumping machinery along with electromechanical components at wss laroka part-ii of jal shakti phe mech division rajouri ut of jk under jal jeevan mission jjm on turnkey basis
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreof your Industry type