Tender Details
Particulars | Details |
---|---|
Title |
Special Repair To Daya West Canal For The Year 2024 25 Such As Repair Of Pot Holes In Patches From Rd 3.500 Km To Rd 8.400 Km Right Side Embankment
|
Description |
Special Repair To Daya West Canal For The Year 2024 25 Such As Repair Of Pot Holes In Patches From Rd 3.500 Km To Rd 8.400 Km Right Side Embankment
|
Organisation | EIC-CIVIL | State Govt. and UT |
Tender Id | 2024_EICCL_104978_2 |
Reference Number |
TENDER CALL NOTICE NO.23 OF 2024-25 |
Tender Fee | 10000 |
EMD | 80842 |
Tender Value | |
Place | Bhubaneswar |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=507029 |
Start Date | September 19, 2024 00:25 |
End Date |
24/09/2024 ( Expired 262 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreIndependent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Read moreShort term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh 326a in the state of odisha for the year 2024-25.
Short term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh-326a in the state of odisha for the year 2024-25.
Read moreSpecial repair of road from kedat sahoo shop to bijay naik house at dhurpada in ward no-20 for the year 2025-26
Special repair of road from kedat sahoo shop to bijay naik house at dhurpada in ward no-20 for the year 2025-26
Read moreShort term maintenance contract stmc estimate from km 345.480 to km.351.480 except from km.347.450 to 347.900 and 348.600 to 349.200 1.050km of nh 26 in the state of odisha for the year 2024 25.
Short term maintenance contract stmc estimate from km 345.480 to km.351.480 except from km.347.450 to 347.900 and 348.600 to 349.200 1.050km of nh 26 in the state of odisha for the year 2024 25.
Read moreImprovement of road with paver block and drain with cover slab from church chhaka to dharanidhar statue (right side) in ward no-14 for the year 2025-26.
Improvement of road with paver block and drain with cover slab from church chhaka to dharanidhar statue (right side) in ward no-14 for the year 2025-26.
Read moreEoi for feasibility study for recharging structures, water bos to increase the ground water potential by flood water of river yamuna in buriya nallah from rd 25 km to 35 km having its connectivity with river yamuna at rd 25 km etc.
Eoi for feasibility study for recharging structures, water bos to increase the ground water potential by flood water of river yamuna in buriya nallah from rd 25 km to 35 km having its connectivity with river yamuna at rd 25 km etc.
Read moreImprovement to pedakonda jharapalli road 10.00 km. jharapali - nuagada-2.50 km. and pandripani to pedakonda road-1.30 km road in the district of malkangiri under mmsy-improvement to existing rd road for the year 2024-25.
Improvement to pedakonda jharapalli road 10.00 km. jharapali - nuagada-2.50 km. and pandripani to pedakonda road-1.30 km road in the district of malkangiri under mmsy-improvement to existing rd road for the year 2024-25.&#x0d &#x0d
Read moreof your Industry type