Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Work Of Power Transformers In 33/11 Kv Power Substations Under Electricity Distribution Division Kachhawa Under O And M 2025 26
|
Description |
Maintenance Work Of Power Transformers In 33/11 Kv Power Substations Under Electricity Distribution Division Kachhawa Under O And M 2025 26.
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3540 |
EMD | 15000 |
Tender Value | |
Place | SUPERINTENDING ENGINEER EDC Mirzapur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 20, 2025 15:35 |
End Date |
31/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreTsgp-31/ rdss/2025-26
Development of distribution infrastructure of 11 kv feeders (urban and industrial) emanating from 66 kv sub-stations sector 1,2,3,4,8 in imt manesar of gurugram-1 circle, dhbvn under rds scheme.
Read moreIndependent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through
Read moreIndependent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode
Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode
Read moreCa no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Ca no. ge af no.1/gur-20/2025-26 comprehensive (b/r) maintenance works including joinery works incl upvc doors and windows in building no p/144 to p/153 at sekhon vihar area at af stn palam, under ge (af) gurgaon no 1
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreRound the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,
Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling
Read moreCwe/ggn/gt-03/2025-26 special repair / replacement of flooring, joinery, plastering, sanitary fittings alongwith periodical services and internal e/m works for kv staff qtr type-ii, type-iii and type-iv at af stn narela under ge (af) gurgaon
Special repair / replacement of flooring, joinery, plastering, sanitary fittings alongwith periodical services and internal e/m works for kv staff qtr type-ii, type-iii and type-iv at af stn narela under ge (af) gurgaon
Read moreof your Industry type