Tender Details
Particulars | Details |
---|---|
Title |
Work Of Tracking Of 100 Nos. Gps Enabled Tippers/ Trucks For Transportation Of Rom Coal From Various Coal Mines To Chp At Stps, Sarni On Behalf Of Stps, Mppgcl Sarni.
|
Description |
Work Of Tracking Of 100 Nos. Gps Enabled Tippers/ Trucks For Transportation Of Rom Coal From Various Coal Mines To Chp At Stps, Sarni On Behalf Of Stps, Mppgcl Sarni.
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1295 |
EMD | 33100 |
Tender Value | |
Place | Works |
Link |
AAAAAAAAAA Login to view |
Start Date | March 26, 2025 18:30 |
End Date |
21/04/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contract for freight forwarding on consolidation basis and customs clearance of imported
Contract for freight forwarding on consolidation basis and customs clearance of imported
 consignments from various ries up to neeri, nagpur (india) its five zonal centres located at
 mumbai, delhi, channai, kolkata hyderabad
Read moreContract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Contract for loading of coal at colliery colliery pit head stack yard and transportation of coal by road with dumpers tippers hyva from different collieries coal washeries of bccl ecl ccl any other coal company to rtps coal yard under distance.
Read moreRenovation of drains from around the railway track, trs, chp, the coal transportation road from icl gate to bazari more and khottadihi more to icl gate for monsoon under s b area
Renovation of drains from around the railway track, trs, chp, the coal transportation road from icl gate to bazari more and khottadihi more to icl gate for monsoon under s b area
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreWork contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Work contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Read moreTransportation of coal from jkoc coal mine to yellandu chp, yellandu area on weight basis for a period of 2 years.
Transportation of coal from jkoc coal mine to yellandu chp, yellandu area on weight basis for a period of 2 years.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreWork proposal for fabrication of various types screen plate for rotary breaker and ring granulator installed at 4x210 mw chp i at sgtps,mppgcl birsinghpur
Work proposal for fabrication of various types screen plate for rotary breaker and ring granulator installed at 4x210 mw chp i at sgtps,mppgcl birsinghpur
Read moreWork of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl
Work of providing &#x0d consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal &#x0d mines of wcl withing 40 km to stps, mppgcl
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreof your Industry type