Tender Details

Particulars Details
Title
Various Types Of 33 Kv Lines And Output 11 Kv Feeders Installed At Various 33/11 Kv Power Sub Stations In The Working Area Of Sdo Ii, Gulaothi And Iii, Sikandrabad (Industrial Area) Under Edd I, Bulandshahr. State Through, Installation/Replacement Wo
Description
Various Types Of 33 Kv Lines And Output 11 Kv Feeders Installed At Various 33/11 Kv Power Sub Stations In The Working Area Of Sdo Ii, Gulaothi And Iii, Sikandrabad (Industrial Area) Under Edd I, Bulandshahr. State Through, Installation/Replacement Wo
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_PVVNL_978191_1
Reference
Number
57/EDC-II/BSR/24-25
Tender Fee 1180
EMD 2000
Tender Value
Place BULANDSHAHR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1725718
Start Date December 06, 2024 15:30
End Date

16/12/2024 ( Expired 150 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Work of providing and installing damaged mechanical tripping relay installed at 33/11 kv sub-stations under edd-i, bulandshahr by etd-ii, bulandshahr.

Work of providing and installing damaged mechanical tripping relay installed at 33/11 kv sub-stations under edd-i, bulandshahr by etd-ii, bulandshahr.

Read more
Work of replacement/repair of faulty parts of capacitor bank and associated parts/accessories to make them operational installed at 33/11 kv sub-stations in the area of pvvnl including annual maintenance

Work of replacement/repair of faulty parts of capacitor bank and associated parts/accessories to make them operational installed at 33/11 kv sub-stations in the area of pvvnl including annual maintenance

Read more
Sitc of hv side porcelain bushing with metal parts lugs rubber and gasket washer with aluminum clamp (complete) for various 33 kv power transformers installed at various 33 kv electric sub-stations

Sitc of hv side porcelain bushing with metal parts lugs rubber and gasket washer with aluminum clamp (complete) for various 33 kv power transformers installed at various 33 kv electric sub-stations

Read more
Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations pokhri in edsd pokhri under edd gopeshwar through outer agency against oandm head

Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations pokhri in edsd pokhri under edd gopeshwar through outer agency against oandm head

Read more
Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations kothiyalsain and nandprayag in edsd chamoli under edd gopeshwar through outer agen

Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations kothiyalsain and nandprayag in edsd chamoli under edd gopeshwar through outer agen

Read more
Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations ghat in edsd chamoli under edd gopeshwar through outer agency against oandm head

Maintenance work of associated ht/lt lines, replacement of idf meters and disconnection of defaulter consumers (from 01-04-2025 to 31-03-2026) of 33/11 kv sub stations ghat in edsd chamoli under edd gopeshwar through outer agency against oandm head

Read more
Installation of rmus to eliminate the problem of power disruption of 02 nos 11 kv industrial feeders-i and ii emanating from 33/11 kv substation naipura in the area of edd gajraula under bussiness plan (part-ii).

Installation of rmus to eliminate the problem of power disruption of 02 nos 11 kv industrial feeders-i and ii emanating from 33/11 kv substation naipura in the area of edd gajraula under bussiness plan (part-ii).

Read more
Tripping system by repairing the damaged charging motor, tripping relay, indication, tripping coil and master relay of 33 kv vcb installed at 33/11 kv power sub-stations in the jurisdiction of edd-v, bulandshahr under etd-ii, bulandshahr.

Tripping system by repairing the damaged charging motor, tripping relay, indication, tripping coil and master relay of 33 kv vcb installed at 33/11 kv power sub-stations in the jurisdiction of edd-v, bulandshahr under etd-ii, bulandshahr.

Read more
Supply of various types of 33 kv and 11 kv materials in the area of edd iii jaunpur

Supply of various types of 33 kv and 11 kv materials like lug clamp stud fuse wire etc in the area of edd iii jaunpur

Read more
Business plan 2024-25 (part-2) replacement of jarjar wires of 33 kv line and vcb at sub-centres. the act of changing. under edd-sikandrabad, bulandshahr

Business plan 2024-25 (part-2) replacement of jarjar wires of 33 kv line and vcb at sub-centres. the act of changing. under edd-sikandrabad, bulandshahr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise