Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Transporting, Shifting, Replacement And Installation Of Different Size Motors For Secondary Crusher, 48 Pump, 59 Pump, Bc 4, Bc 9, Sc 1 Screen, Room Bc, U/G Vertical Pump, Clean Coal Bc, Middling Coal Bc, Dewatering Screen Etc. Old And N
|
| Description |
Dismantling, Transporting, Shifting, Replacement And Installation Of Different Size Motors For Secondary Crusher, 48 Pump, 59 Pump, Bc 4, Bc 9, Sc 1 Screen, Room Bc, U/G Vertical Pump, Clean Coal Bc, Middling Coal Bc, Dewatering Screen Etc. Old And N
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_289065_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/23-24/58 Date 18.09.2023 |
| Tender Fee | - |
| EMD | 3000 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 19, 2023 16:30 |
| End Date |
Expired
28/09/2023
Expired 1094 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Repairing of carrier roller frame of clean coal bc, middling coal shuttle bc, middling coal bc in main plant at sawang washery.
Read moreDismantling, transporting, shifting, replacement and installation of different size motors and changing of motor base for middling coal shuttle conveyor, clean coal conveyor, bc-8, impact crusher, bc-1, 51bc, bc-2, feeder, s-1 screen, primary crusher
Dismantling, transporting, shifting, replacement and installation of different size motors and changing of motor base for middling coal shuttle conveyor, clean coal conveyor, bc-8, impact crusher, bc-1, 51bc, bc-2, feeder, s-1 screen, primary crusher
Read moreTransporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Transporting, shifting and changing of different size motors of 51bc, 40bc, bc-04, bc-05, bc-07, transfer bc, secondary crusher, impact crusher, clean coal shuttle bc, s-1 screen welding machine of p.c.h. and deshaling plant and dismantling and modif
Read moreRepairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Repairing of different chain sprocket of different belt conveyor of main plant (40bc, 51bc by pass bc slurry bc, middling coal bc, clean coal bc, clean coal shuttle bc, middling coal shuttle bc, stockpile bc and shuttle wheel track line etc. in main
Read moreFabrication/erection and repairing of tail drum structure, gear box structure motor base structure of bc-5, 40bc, clean coal bc, middling coal bc in main plant of sawang washery.
Fabrication/erection and repairing of tail drum structure, gear box structure motor base structure of bc-5, 40bc, clean coal bc, middling coal bc in main plant of sawang washery.
Read moreDismantling, transporting, shifting, replacement and installation of different size motors for bc 9, vertical pump near (rom t/d), bc-6, dewatering screen, bc-4, 51 by pass bc s-1 screen, 40 bc, 52 bc, picking bc, a shuttle bc (old and new motors) e
Dismantling, transporting, shifting, replacement and installation of different size motors for bc 9, vertical pump near (rom t/d), bc-6, dewatering screen, bc-4, 51 by pass bc s-1 screen, 40 bc, 52 bc, picking bc, a shuttle bc (old and new motors) e
Read moreFabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Fabrication / erection of top roller frame of different belt conveyors 40bc, 51bc by pass bc, slurry bc, clean coal, middling coal bc and clean coal, middling coal shuttle bc etc. work in main plant of sawang washery for a period of 06 months.
Read moreRepairing/ changing, replacement of different belt conveyor (04 bc, slurry bc, by pass bc, clean coal bc, middling coal bc, middling coal shuttle bc, stock pile bc etc) belt conveyor, structure, post, skirt guard, frame etc work of in main plant at
Repairing/ changing, replacement of different belt conveyor (04 bc, slurry bc, by pass bc, clean coal bc, middling coal bc, middling coal shuttle bc, stock pile bc etc) belt conveyor, structure, post, skirt guard, frame etc work of in main plant at
Read moreRepairing/ changing of damaged discharge chutes of clean coal screens 607-1,2,3,4, slurry dewatering screen 607-5,6,7 and 8 at 18 mtr. floor, discharge chute of middling screen 621-1,2 and discharge chute of unit 610 at 7 mtr. floor moonidih washery
Repairing/ changing of damaged discharge chutes of clean coal screens 607-1,2,3,4, slurry dewatering screen 607-5,6,7 and 8 at 18 mtr. floor, discharge chute of middling screen 621-1,2 and discharge chute of unit 610 at 7 mtr. floor moonidih washery
Read moreRepairing of dewatering screen and sc-2 screen of deshaling plant of sawang washery.
Repairing of dewatering screen and sc-2 screen of deshaling plant of sawang washery.
Read moreof your Industry type