Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Rcc Covered Drain From Dharauli Pond In Ward No. 11 Sumerganj West To Kesari Mishra And Chhotu Karamat House
|
Description |
Construction Work Of Rcc Covered Drain From Dharauli Pond In Ward No. 11 Sumerganj West To Kesari Mishra And Chhotu Karamat House
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3500 |
EMD | 70000 |
Tender Value | |
Place | NAGAR PANCHAYAT RAMSANEHIGAHAT BARABANKI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 03, 2025 20:30 |
End Date |
13/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreIe services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Ie services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type