Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Type B Residence (53 Nos.) For 10th Bn P.A.C. Faizabad Road District Barabanki (U.P.)
|
Description |
Construction Of Type B Residence (53 Nos.) For 10th Bn P.A.C. Faizabad Road District Barabanki (U.P.)
|
Organisation | UP Rajkiya Nirman Nigam Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 28.41 Lakh |
Tender Value | |
Place | BARABANKI |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 15:30 |
End Date |
08/05/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreProposed construction of 2 nos type i quarters 2 nos type ii quarters 2 nos type iii quarters single unit type v quarter banglow type approach road at tr and ci premises lembucherra tripura
Proposed construction of 2 nos type i quarters 2 nos type ii quarters 2 nos type iii quarters single unit type v quarter banglow type approach road at tr and ci premises lembucherra tripura
Read moreConstruction of 4x250 mva, 33/400 kv x-mers, bays for four nos 400 kv tl for pps-i alongwith 400 kv, 1x125 mvar, shunt reactor (bus type) and 4x250 mva, 33/400 kv x-mers, bays for three nos 400 kv tl for pps-ii at village ramsar chhota,pugal, bikaner
Construction of 4x250 mva, 33/400 kv x-mers, bays for four nos 400 kv tl for pps-i alongwith 400 kv, 1x125 mvar, shunt reactor (bus type) and 4x250 mva, 33/400 kv x-mers, bays for three nos 400 kv tl for pps-ii at village ramsar chhota,pugal, bikaner
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreRewiring of 80 nos old type iii b quarters in donimalai township phase ii
Rewiring of 80 nos old type iii b quarters in donimalai township phase ii
Read moreHiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Hiring of 02 nos. each truck mounted mist cannon system and truck mounted road sweeper system along with manpower for period of three years at dpa
Read moreWbphed/01/bwn of se/cc of 2025-26 sl.no.2
Balance work such as construction of approach road sinking of additional tube well construction of pump house land development and other allied work for different pwss under mangolkote block under katwa subdivn within burdwan divn phe dte.
Read moreof your Industry type