Tender Details
Particulars | Details |
---|---|
Title |
Mmpna/2023 24/206
|
Description |
Periodic Renewal Of Road Dhing Baruati Jajori Kurwabahi Bebejia Ghahi Dakhinpath Nonoi Chutiagaon Road (Bebejia Chariali Nh 37 Byepass) Part 2 (From Ch. 26.700 Km To 26.760 Km 27.00 Km To 28.50 Km ), Sh 16 (Segment From Amsoi Tiniali To Sivakunda
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2023_PWD_34955_42 |
Reference Number |
|
Tender Fee | 3500 |
EMD | 3.48 Lakh |
Tender Value | |
Place | Nagaon |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=56810 |
Start Date | December 26, 2023 21:30 |
End Date |
09/01/2024 ( Expired 491 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Renewal work by pc in mayali-guptakashi (sh-37) motor road from km 42 to 44 and 45, 48 50 to 53 in district rudraprayag under annual repair.
Renewal work by pc in mayali-guptakashi (sh-37) motor road from km 42 to 44 and 45, 48 50 to 53 in district rudraprayag under annual repair.
Read moreConstruction of new 4 lane access controlled highway from cuttack (end point of crrr at nh 16 near tangi) to kandarpur on sh 12 from design ch. 0.000 km to 21.225 under nh(o) on hybrid annuity mode in the state of odisha
Construction of new 4 lane access controlled highway from cuttack (end point of crrr at nh 16 near tangi) to kandarpur on sh 12 from design ch. 0.000 km to 21.225 under nh(o) on hybrid annuity mode in the state of odisha
Read moreFdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call
Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call
Read moreStrengthening of gonda twisa-raishyabari road from ch. 28.50 km to ch. 32.00 km (l-2.50km)/sh- patch metalling, carpeting, road furniture, side drain etc.
Strengthening of gonda twisa-raishyabari road from ch. 28.50 km to ch. 32.00 km (l-2.50km)/sh- patch metalling, carpeting, road furniture, side drain etc.
Read morePeriodic renewal of nh-37 to kolbari chengaliati chariali to parbatia sarucharai extention from ch. 11.401km to 12.501km l-1.10km ,nh37 to sonari gaon phukanar ali l-5.00km, from ch. 0.00m to ch. 5000.00munder mmpna 2023-24-teok lac
Periodic renewal of nh-37 to kolbari chengaliati chariali to parbatia sarucharai extention from ch. 11.401km to 12.501km l-1.10km ,nh37 to sonari gaon phukanar ali l-5.00km, from ch. 0.00m to ch. 5000.00munder mmpna 2023-24-teok lac
Read moreMmuppna_ridf_xxx_24_25_180 improvement of road from nh 37 to bonkual e and d dyke via mohura chariali and bortol (ch. 0.00m to ch. 8350.00m) under mukhya mantrir unnoto pakipath nirman aachani (mmuppna) under ridf-xxx of nabard for the year 2024-25.
Mmuppna_ridf_xxx_24_25_180 improvement of road from nh 37 to bonkual e and d dyke via mohura chariali and bortol (ch. 0.00m to ch. 8350.00m) under mukhya mantrir unnoto pakipath nirman aachani (mmuppna) under ridf-xxx of nabard for the year 2024-25.
Read morePeriodic renewal of nh-37 to kolbari chengaliati chariali to parbatia sarucharai extention from ch. 11.401km to 12.501km l-1.10km nh37 to sonari gaon phukanar ali l-5.00km, from ch. 0.00m to ch. 5000.00m under mmpna 2023-24- teok lac
Periodic renewal of nh-37 to kolbari chengaliati chariali to parbatia sarucharai extention from ch. 11.401km to 12.501km l-1.10km nh37 to sonari gaon phukanar ali l-5.00km, from ch. 0.00m to ch. 5000.00m under mmpna 2023-24- teok lac
Read moreMmuppna_ridf_xxx_24_25_180 improvement of road from nh-37 to bonkual e and d dyke via mohura chariali and bortol (ch. 0.00m to ch. 8350.00m) under mukhya mantrir unnoto pakipath nirman aachani (mmuppna) under ridf-xxx of nabard for the year 2024-25
Mmuppna_ridf_xxx_24_25_180 improvement of road from nh-37 to bonkual e and d dyke via mohura chariali and bortol (ch. 0.00m to ch. 8350.00m) under mukhya mantrir unnoto pakipath nirman aachani (mmuppna) under ridf-xxx of nabard for the year 2024-25
Read moreFdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-ii.
Fdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-ii.
Read moreFdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i
Fdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i
Read moreof your Industry type