Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pipe Distribution Network (Pdn) System
|
| Description |
Construction Of Pipe Distribution Network Pdn&Amp#X0d
System For Dy No 1 Including Minors Sub Minors&Amp#X0d
Formation Of Wua Running And Maintenance For Five Years
|
| Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
| Tender Id | 2024_CWRDP_1024901_1 |
|
Reference Number |
Tender Notice no 14 For 2023-24 |
| Tender Fee | 11800 |
| EMD | 60.62 Lakh |
| Tender Value | |
| Place | Solapur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1792599 |
| Start Date | March 04, 2024 17:05 |
| End Date |
Expired
02/04/2024
Expired 847 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Licensing of co-branding and inside advertising rights of nine no. metro stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in upmrc network.
Licensing of co-branding and inside advertising rights of nine no. metro 
 stations of corridor-1 (taj east gate - rbs college) of agra metro rail project in 
 upmrc network.
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of pipe distribution network (pdn) for adarki minor at ch.81/160 of dhom balkawadi right bank canal
Construction of pipe distribution network (pdn) for adarki minor at ch.81/160 of dhom balkawadi right bank canal
Read moreArakchinchala lmi tank tq mangrulpir dist washim construction of pipe distribution network, including formation of water user association maintaining the system for 60 month after completion of pdn and handing over of whole pdn system to water
Arakchinchala lmi tank tq mangrulpir dist washim construction of pipe distribution network, including formation of water user association maintaining the system for 60 month after completion of pdn and handing over of whole pdn system to water
Read moreConstruction of gravity based pipe distribution network including formation of water user association, maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user association of wadiraital lmi
Construction of gravity based pipe distribution network including formation of water user association, maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user association of wadiraital lmi
Read moreConstruction of gravity based pipe distribution network including formation of water user association, maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user association of wadiraital lmi
Construction of gravity based pipe distribution network including formation of water user association, maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user association of wadiraital lmi
Read moreConstruction of gravity based pipe distribution network including surveying designing drawing formation of water user association , maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user as
Construction of gravity based pipe distribution network including surveying designing drawing formation of water user association , maintenance of the system for 60 months after completion of pdn and handing over of whole pdn system to water user as
Read moreof your Industry type