Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🌉 Procurement Notice: Dismantling Of Damaged Old Bridge At Talri Nallah Bakihaker Handwara 🛠️ The Public Works Department (Pwd), State Govt. And Ut, Has Issued A Tender For The Dismantling Of A Damaged Old Bridge At Talri Nallah Bakihaker, Handwara, And The Subsequent Shifting Of Materials From The Site To The Divisional Store. 📅 Bid Submission Deadline: May 22, 2024, 2:00 Pm Interested Contractors Are Required To Submit A Tender Fee Of Inr 600 And An Earnest Money Deposit (Emd) Of Inr 20,600. Proposals Must Include Detailed Plans For The Dismantling Process, Environmental Considerations, And The Logistics Of Material Relocation. Keywords: Pwd, State Govt. And Ut, Bridge Dismantling, Material Shifting, Tender, Emd, Procurement, Handwara| Particulars | Details |
|---|---|
| Title |
Dismantling Of Damaged Old Bridge At Talri Nallah Bakihaker Handwara And Shifting Of Material From Site To Divisional Store
|
| Description |
Dismantling Of Damaged Old Bridge At Talri Nallah Bakihaker Handwara And Shifting Of Material From Site To Divisional Store
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWDJK_248626_1 |
|
Reference Number |
NIT NO 03 Handwara of 2024-25 |
| Tender Fee | 600 |
| EMD | 20600 |
| Tender Value | - |
| Place | Handwara |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=724722 |
| Start Date | May 15, 2024 21:30 |
| End Date |
Expired
22/05/2024
Expired 876 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, shifting and removal of damaged unserviceable portions for nagarjuna konda museum
Dismantling, shifting and removal of damaged unserviceable portions for nagarjuna konda museum
Read moreConstruction of divisional store in place of damaged collapsed old store at power development department complex choglamsar leh
Construction of divisional store in place of damaged collapsed old store at power development department complex choglamsar leh
Read moreShifting of 11 kv phuljhar feeder near phuljhar nallah due to construction of hl bridge over phuljhar nallah on khutgaon keonjhar border road of r and b division rourkela under eso mahuldiha
Shifting of 11 kv phuljhar feeder near phuljhar nallah due to construction of hl bridge over phuljhar nallah on khutgaon keonjhar border road of r and b division rourkela under eso mahuldiha
Read moreLaying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.
Laying of cement concrete coping over existing crate tops and exposed offsets including restoration/repair of damaged crates on sonman nallah u/s bridge at rd 14420 m.
Read moreShifting, loading, carting and unloading installation, testing, commissioning and dismentalling after mela of the pumping plant (28 nos), dozer (56 nos) , d.g. set (28 nos) and stabilizer etc all complete from mela store to different tubewell site in
Shifting, loading, carting and unloading installation, testing, commissioning and dismentalling after mela of the pumping plant (28 nos), dozer (56 nos) , d.g. set (28 nos) and stabilizer etc all complete from mela store to different tubewell site in
Read moreDevelopment of new a site ro at from ulhas river bridge, dugadgaon to nagle bus stop on lhs of sh while moving from vadhghar to nagle, village payegaon, taluka bhiwandi, dist thane under mumbai divisional office of maharashtra state office
Development of new a site ro at from ulhas river bridge, dugadgaon to nagle bus stop on lhs of sh while moving from vadhghar to nagle, village payegaon, taluka bhiwandi, dist thane under mumbai divisional office of maharashtra state office
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreDismantling/shifting of damaged bridge at khumriyal
Dismantling/shifting of damaged bridge at khumriyal
Read moreShifting of material from kec site store to divisional store udhampur
Shifting of material from kec site store to divisional store udhampur
Read moreof your Industry type