Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling Shifting Of Damaged Bridge At Khumriyal(balance Portion)
|
| Description |
Dismantling Shifting Of Damaged Bridge At Khumriyal(balance Portion)
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWDJK_279169_1 |
|
Reference Number |
FRESH NIT 13 |
| Tender Fee | 600 |
| EMD | 12500 |
| Tender Value | - |
| Place | Lolab |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856467 |
| Start Date | June 19, 2025 23:30 |
| End Date |
Expired
25/06/2025
Expired 440 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of bridge across bhedan river at village khinda in sambalpur district, odisha.
Construction of bridge across bhedan river at village khinda in sambalpur district, odisha.
Read moreEstimate for shifting of existing tranformers and electrical ht lt line poles in the chikkodi town at ankalikoot to duega bhavan
Estimate for shifting of existing tranformers and electrical ht/lt line poles in the chikkodi town at ankalikoot to duega bhavan
Read moreRepairs to damaged structure member using retrofitting mathod and roof treatment at jalipa mil stn under ge (a) barmer
Repairs to damaged structure member using retrofitting mathod and roof treatment at jalipa mil stn under ge (a) barmer
Read moreConstruction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Construction of bridge at 0.85 km on deshnur-mattikoppa (major district road) of kittur constituency in bailhongal taluk
Read moreConstruction of remaining portion of road around the perimeter wall of central jail buxar. for the year - 2026-2027.
Construction of remaining portion of road around the perimeter wall of central jail buxar. for the year - 2026-2027.
Read moreConstruction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Read moreDg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Dg ranjangaon growth center. m and r to water supply schemes at ranjangaon. strengthening of bridge walkway, traction and suspender assemblies and flocculation clarifier tank structure etc for clf no. 1 and other misc works at water supply scheme, ra
Read moreConstruction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.
Construction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.
Read moreComprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Read moreRepair work of 800mm dia bws pipe line in gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe , korlahalli 2nd bridge and dhoni cross ,hammagi jack well pump house ,adavisambapur bharath petrol bunk , lic office near ring road papanasi kalmeshwar temple cross at gbcmc limits.
Repair work of 800mm dia bws pipe line in 1) gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe 3) near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe 8) korlahalli 2nd bridge and dhoni cross 9) hammagi jack well pump house 10) adavisambapur bharath petrol bunk , lic office near ring road 11) papanasi kalmeshwar temple cross at gbcmc limits.
Read moreof your Industry type