Tender Details
Particulars | Details |
---|---|
Title |
Balane Work C O Rest House Building At Kawar Tehsil Dodra Kawar District Shilmla Construction Of Building Portion Site Development Rain Water Harvesting Tank And Ws And Si And Septic Tank Etc
|
Description |
Balane Work C O Rest House Building At Kawar Tehsil Dodra Kawar District Shilmla Construction Of Building Portion Site Development Rain Water Harvesting Tank And Ws And Si And Septic Tank Etc&Amp#X0d
&Amp#X0d
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_96669_1 |
Reference Number |
846-53 dated19-10-24 |
Tender Fee | 5000 |
EMD | 4 Lakh |
Tender Value | |
Place | kwr |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=141944 |
Start Date | December 17, 2024 23:30 |
End Date |
24/12/2024 ( Expired 117 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreConstruction of sewer line rain water harvesting and tubewell in premises of lucknow museum at lucknow
Construction of sewer line rain water harvesting and tubewell in premises of lucknow museum at lucknow
Read moreArchitectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Architectural finishing works including dfse and roof sheeting of pre-engineered building (peb) structures and dc of external facade, ws, si, drainage, site development works at four (04) elevated stations of line-10 of delhi mrts phase-iv project.
Read moreConstruction of rain water harvesting (hwra) at bkn govt. polytechnic at narnaul in mohindergarh district.
Construction of rain water harvesting (hwra) at bkn govt. polytechnic at narnaul in mohindergarh district.
Read moreConstruction of c.c road and rcc u shape drain under c m urban infrastructure development scheme phase iv state government fund at ward no. 13 alladin house to nagar parishad office and ballu kaurav towards nariya.
Construction of c.c road and rcc u shape drain under c m urban infrastructure development scheme phase iv state government fund at ward no. 13 alladin house to nagar parishad office and ballu kaurav towards nariya.
Read moreConstruction and maintenance of recharge pit with sump house to over come water logging problem at 132 kv sub station
Construction and maintenance of recharge pit with sump house to over come water logging problem at 132 kv sub station kasganj district- kasganj&#x0d
Read moreProvn of aluminium partition in icu ward, 02 x iron chain gate for med store and qm store at 183 mh provn of 1 x 10000 ltrs static water tank near tok pump area of 27 (i) r o flt , provn of sokage well septic tank and drain near bldg no t968
Provn of aluminium partition in icu ward, 02 x iron chain
 gate for med store and qm store at 183 mh provn of 1 x 10000
 ltrs static water tank near tok pump area of 27 (i) r o flt
 , provn of sokage well septic tank and drain near bldg
 no t968
Read moreof your Industry type