Tender Details

Particulars Details
Title
Various Works Under Liquid Waste Management Project.
Description
Construction Of Circular Community Leach Pit, Modified Comm. Leach Pit, And Filter Chamber, In Balichak And Dhurkhali Village, For L.W.M. Project Under Balichak G.P., Under Sbm (G) And 15th Cfc Tied Fund For The 23 24 F.Y.
Organisation Government of West Bengal
Tender Id 2023_ZPHD_591077_3
Reference
Number
WB/HWH/AMTA-I/BGP/NIET/2023/11
Tender Fee 500
EMD 18300
Tender Value -
Place Balichak GP
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date October 14, 2023 17:30
End Date
Expired 03/11/2023

Expired 1057 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call

Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call

Read more
Provn of mobile dg set alongwith associated works at 12 wing under ge (af) chandigarh

Provn of mobile dg set alongwith associated works at 12 wing under ge (af) chandigarh

Read more
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Read more
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Various works under liquid waste management project.

Construction of circular community leach pit, const. of modified comm. leach pit, and const. of filter chamber, in khaira, sarpai and bhojan village, for l.w.m. project under balichak g.p., under sbm (g) and 15th cfc tied fund for the 23-24f.y.

Read more
Various works under liquid waste management project.

Const. of circular community leach pit, modified comm. leach pit, and filter chamber, in bagua, saibona, purbo bajepratap and banuchak, for l.w.m. project under balichak g.p., under sbm (g) and 15th cfc tied fund for the 23-24f.y.

Read more
Liquid waste management project

Construction of lwm project at deulgram mouza

Read more
Liquid waste management project

Construction of lwm project at khansra kotai mouza

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise