Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Up Keeping Of Both Road W/B Pit (Including Its Joist, Lever, Pit Well) To Avoid Error At Time Of Weighment (As And When Required) At Raw Coal Sawang Washery.
|
| Description |
Up Keeping Of Both Road W/B Pit (Including Its Joist, Lever, Pit Well) To Avoid Error At Time Of Weighment (As And When Required) At Raw Coal Sawang Washery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_293981_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/23-24/98 Date 17.11.2023 |
| Tender Fee | - |
| EMD | 3000 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 18, 2023 16:30 |
| End Date |
Expired
28/11/2023
Expired 1051 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up keeping of both road w/b pit (including its joist, lever, load cell, mounting, insulating pad etc.) to avoid error at time of weighment (as and when required) at sawang washery.
Up keeping of both road w/b pit (including its joist, lever, load cell, mounting, insulating pad etc.) to avoid error at time of weighment (as and when required) at sawang washery.
Read moreRepairing of 02 nos. fluid coupling for the belt conveyor under raw coal at sawang washery.
Repairing of 02 nos. fluid coupling for the belt conveyor under raw coal at sawang washery.
Read moreRemoval /up-keeping of foreign material of supplied railway empty wagon before loading of washery product for one year at sawang washery.
Removal /up-keeping of foreign material of supplied railway empty wagon before loading of washery product for one year at sawang washery.
Read moreDismantling and repairing of primary crusher c.i. pulley welding and strengthening etc. in raw coal section at sawang washery.
Dismantling and repairing of primary crusher c.i. pulley welding and strengthening etc. in raw coal section at sawang washery.
Read moreDismantling, fabrication/erection, repairing of iron and steel structure like joist, plate work etc. of road weigh bridge no. 01 of weigh bridge at sawang washery.
Dismantling, fabrication/erection, repairing of iron and steel structure like joist, plate work etc. of road weigh bridge no. 01 of weigh bridge at sawang washery.
Read moreDismantling, repairing and fabrication of g.m. split bush and split block(angle type) at under raw coal section of sawang washery.
Dismantling, repairing and fabrication of g.m. split bush and split block(angle type) at under raw coal section of sawang washery.
Read moreDismantling, repairing and fabrication of g.m. split bush and split block (angle type) at under raw coal section of sawang washery.
Dismantling, repairing and fabrication of g.m. split bush and split block (angle type) at under raw coal section of sawang washery.
Read moreBreak-up- cum repairing and fabrication of hub, main shaft and g.m. bush of single crusher at under raw coal section of sawang washery.
Break-up- cum repairing and fabrication of hub, main shaft and g.m. bush of single crusher at under raw coal section of sawang washery.
Read moreFabrication and erection of 320 kw motor and base structure its channel, angle plate, joist etc. with dismantling and fitting of raw coal section at kathara washery
Fabrication and erection of 320 kw motor and base structure its channel, angle plate, joist etc. with dismantling and fitting of raw coal section at kathara washery
Read moreErection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Erection and strengthening of overhead line, damaged pole, conductor etc. at around plant and colony of sawang washery as and when damaged from storm, rain and other reasons.
Read moreof your Industry type