Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tender For Shifting Of 33 K V Ht Line Kohlamalankan To Bharolijadid , Providing 3 Phase Lt Line To Iph Scheme At Tihri Road In Electrical Section Amb And 3 Phase Lt Line In Malibara
|
| Description |
Tender For Shifting Of 33 K V Ht Line Kohlamalankan To Bharolijadid , Providing 3 Phase Lt Line To Iph Scheme At Tihri Road In Electrical Section Amb And 3 Phase Lt Line In Malibara
|
| Organisation | HPSEBL | State Govt. and UT |
| Tender Id | 2024_HPSEB_93899_1 |
|
Reference Number |
HPSEBL/JMK/2024-25/09 |
| Tender Fee | 590 |
| EMD | 7600 |
| Tender Value | - |
| Place | Jawalamukhi |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=138262 |
| Start Date | October 05, 2024 16:30 |
| End Date |
Expired
14/10/2024
Expired 728 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near arabindo kohinoor apartment to sanju kiraana shop kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreShifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Shifting of 11kv, dtrs and lt line road widening near sanju kiraana shop to velama sangam gate kondapur in kondapur section of kondapur sub division in kondapur division of cybercity circle
Read moreProviding of 17 nos. new individual dedicated earth pits for each phase of lightning arrestors (las),duly connecting to existing switchyard earth mat of various feeder bays at 220/132/33 kv ss, mahabubnagar (bhoothpur).
Providing of 17 nos. new individual dedicated earth pits for each phase of lightning arrestors (las),duly connecting to existing switchyard earth mat of various feeder bays at 220/132/33 kv ss, mahabubnagar (bhoothpur).
Read moreProviding of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreBifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-divi
Bifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-division in paradise division of secunderabad circle and the work executed by construction division of secunderabad circle under t and d improvements to original works reserved under sc category
Read moreAt katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-
At katihar division - (i) maintenance work of ht/lt overhead line between kir-si, kir-lava & kir-kosi sections including katihar area under the jurisdiction of sse/elect./p/ic/kir for 02 years. (ii) maintenance work of ht/ltoverhead line between kir-jbn section sections under the jurisdiction of sse/elect./p/ic/kir for 02 years. (iii) maintenance work of ht/lt overhead line between si-bhnp-jau, jau-sri-mfa-boe, boe-kau, mfa-kwe, boe bseb sub-station to boe rly. power house including sub-
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreErection of 33/11 kv indoor ss with 1x16 mva ptr and connected 33kv feeders - 2 nos. 11kv feeders with 4 nos. and construction of control room, compound wall at sagar x road ss at bairamalguda section of vanastalipuram subdivision in champapet division of saroornagar circle in ecgh master plan division in rangareddy circle under t and d improvement works
Erection of 33/11 kv indoor ss with 1x16 mva ptr and connected 33kv feeders - 2 nos. 11kv feeders with 4 nos. and construction of control room, compound wall at sagar x road ss at bairamalguda section of vanastalipuram subdivision in champapet division of saroornagar circle in ecgh master plan division in rangareddy circle under t and d improvement works
Read moreof your Industry type