Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Png Piped Gas Facility
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2025/B/6285686 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 29, 2025 15:18 |
| End Date |
Expired
09/06/2025
Expired 490 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws)
Operation & maintenance of part i: fixed operation of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality), iii.) ward level piped water supply schemes in non quality affected wards (wls_non quality) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive operation & maintenance of i.) rural piped water supply scheme (pws), ii.) single village piped water supply schemes (svs), iii.) ward level piped water supply schemes in quality affected wards (wls_quality) iv.) ward level piped water supply schemes in non quality affected wards (wls_non quality) , i.e. the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in blocks:- 08 total no. of schemes: 280 wls(non quality): 226 wls(quality): 05 pws (non quality): 35 svs (non quality): 14
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreEstablishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Establishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Read moreEstablishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Establishment of integrated solid waste management facility in shankarpally municipality under nagarabhivrudhi grants recall.
Read moreProviding balance drinking water facility to double bed room houses at srirampur (v) of srirampur(m)
Providing balance drinking water facility to double bed room houses at srirampur (v) of srirampur(m)
Read moreProviding 1 no. 6 passenger capacity lift facility to the district court complex, jagitial (for the use of general public)
Providing 1 no. 6 passenger capacity lift facility to the district court complex, jagitial (for the use of general public)
Read moreProviding 1 no. 6 passenger capacity lift facility to the district court complex, jagitial (for the use of judicial officers)
Providing 1 no. 6 passenger capacity lift facility to the district court complex, jagitial (for the use of judicial officers)
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 05 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreDesign, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Design, build, construct, install adn commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years.
Read moreof your Industry type