Tender Details

Particulars Details
Title
Additional Works On Temporary Toll Plaza At Khagaria End (Design Ch. 1.400) Of Section Nh 333 B In The State Of Bihar.
Description
Additional Works On Temporary Toll Plaza At Khagaria End (Design Ch. 1.400) Of Section Nh 333 B In The State Of Bihar.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_198275_1
Reference
Number
NIT No- 01/PIU-Munger/NHAI/2024-25
Tender Fee 25000
EMD 1.54 Lakh
Tender Value -
Place NHAI, PIU - Munger
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=216897

Start Date June 13, 2024 19:40
End Date
Expired 08/07/2024

Expired 833 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Read more
Engagement of user fee collection agency on the basis of e quotation through e-tender at malhipur fee plaza located at km 1.400 between for the use of two lane with paved shoulder of entire nh 333b in bihar

Engagement of user fee collection agency on the basis of e quotation through e-tender at malhipur fee plaza located at km 1.400 between for the use of two lane with paved shoulder of entire nh 333b in bihar

Read more
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)

Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)

Read more
Ie services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.

Ie services for construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km on bot (toll) mode in the state of kerala.

Read more
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Read more
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode

Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km 38.500 (design ch. 6.750) of nh-157 in the state of odisha on epc mode

Read more
Cs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.

Cs for ie services for development of 4 lane badvel to nellore highway from badvel gopavaram village on nh nh-67 (ch.630.960) to guruvindapudi village on nh-16 (ch.739.094) in andhra pradesh on build-operate-transfer (toll) mode for a tl 108.134 km.

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Short term maintenance contract for the stretch of jabalpur hiran river section of nh 45 old nh 12 from design ch. 10.400 to 66.000 in the state of madhya pradesh

Short term maintenance contract for the stretch of jabalpur hiran river section of nh 45 old nh 12 from design ch. 10.400 to 66.000 in the state of madhya pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise