Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenace Work On Nh 325 (Kathadi Section) Between Chainage 71.800 To 72.400 Ans 73.100 To 75.700 In The State Of Rajasthan
|
| Description |
Maintenace Work On Nh 325 (Kathadi Section) Between Chainage 71.800 To 72.400 Ans 73.100 To 75.700 In The State Of Rajasthan
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_792368_1 |
|
Reference Number |
SE NH CIRCLE JODHPUR NIT 02/2023-24 |
| Tender Fee | 10000 |
| EMD | 2.28 Lakh |
| Tender Value | - |
| Place | Jodhpur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=832813 |
| Start Date | January 26, 2024 14:30 |
| End Date |
Expired
21/02/2024
Expired 967 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan
Stmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan
Read moreSpecial repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14 (nh-60)
Special repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14.
Read moreRequest for proposal for the construction of new bg 4th line from chainage 39.998 km to chainage 61.494 km between guduvancheri (incl.) & chengalpattu (incl.) stations (package-ii) for civil engineering, signalling & tele communication, electrical general and 2x25 kv ohe electrification works, including utility shifting between tambaram and chengalpattu
Request for proposal for the construction of new bg 4th line from chainage 39.998 km to chainage 61.494 km between guduvancheri (incl.) & chengalpattu (incl.) stations (package-ii) for civil engineering, signalling & tele communication, electrical general and 2x25 kv ohe electrification works, including utility shifting between tambaram and chengalpattu
Read moreSouth central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
South central railway (construction organization) : engineering, procurement and construction (epc) contract agreement for construction of new bg railway line between chainage 114.400 km and chainage 146.180 km (i.e., 31.78 km) between pro. sircilla (excl.) - pro. vemulawada (incl.) - pro. kothapalli (excl.) stations of manoharabad - kothapalli section of hyderabad division, in the state of telangana
Read moreSlope stabilization work between 9/0 to 10/0 and 33/0 to 36/0 on nh-58e
Slope stabilization work between 9/0 to 10/0 and 33/0 to 36/0 on nh-58e
Read moreConstruction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreProviding and fixing friction / friction cum hydraulic buffer stops at dead ends between chainage 6+015 (fls) to 125+200 (fls) in connection with new bg line between rishikesh and karanprayag (125km) in the state of uttarakhand, india.
Providing and fixing friction / friction cum hydraulic buffer stops at dead ends between chainage 6+015 (fls) to 125+200 (fls) in connection with new bg line between rishikesh and karanprayag (125km) in the state of uttarakhand, india.
Read moreRehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreof your Industry type