Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Bund / Dola / Earthen Dam For Main Reservoir At Main Line And Safety Of Gudha Pan Production Areas Of Compnay.
|
Description |
Construction Work Of Bund / Dola / Earthen Dam For Main Reservoir At Main Line And Safety Of Gudha Pan Production Areas Of Company
|
Organisation | Hindustan Salts Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 93366 |
Tender Value | |
Place | Main Line and Gudha Pan Production Areas |
Link |
AAAAAAAAAA Login to view |
Start Date | May 07, 2025 18:30 |
End Date |
14/05/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreConstruction of two cages and one indoor building in gib cbc at ramdevra for project gib
Construction of two cages and one indoor building in gib cbc at ramdevra for project gib
Read moreConstruction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Construction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreof your Industry type