Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of A New Diversion Cum Sediment Bypass Tunnel For Restoration Of Concrete Dam Construction Sluices And Sediment Management Of Salal Reservoir
|
| Description |
Construction Of A New Diversion Cum Sediment Bypass Tunnel For Restoration Of Concrete Dam Construction Sluices And Sediment Management Of Salal Reservoir
|
| Organisation | NHPC Limited | Corporate Office-Faridabad-NHPC | Contract-Civil-CO-NHPC |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 10000 |
| EMD | 3 Crore |
| Tender Value | 267.94 Crore |
| Place | |
| Link | Login to view |
| Start Date | May 20, 2026 23:30 |
| End Date |
Open
16/10/2026
4 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of reservoir by removal of sediments using amphibious excavators cum dredgers from reservoir of salal dam
Maintenance of reservoir by removal of sediments using amphibious excavators cum dredgers from reservoir of salal dam
Read moreRemoval of deposited sediments from salal dam reservoir
Removal of deposited sediments from salal dam reservoir
Read moreRemoval of deposited sediments from salal dam reservoir
Removal of deposited sediments from salal dam reservoir
Read moreRepair of diversion tunnel invert at baira dam, nakrod of bsps
Repair of diversion tunnel invert at baira dam, nakrod of bsps
Read moreHydrographic survey of salal dam reservoir at dhyangarh for year 2024-25
Hydrographic survey of salal dam reservoir at dhyangarh for year 2024-25
Read moreRetrieval of stuck emergency gate of diversion tunnel at dam site of bsps
Retrieval of stuck emergency gate of diversion tunnel at dam site of bsps
Read morePost monsoon hydrographic survey of salal dam reservoir at dhyangarh for the year 2025-26
Post monsoon hydrographic survey of salal dam reservoir at dhyangarh for the year 2025-26
Read moreMajor repair of 625 meter existing log boom installed in dam reservoir as per scope of work for salal power station
Major repair of 625 meter existing log boom installed in dam reservoir as per scope of work for salal power station
Read moreRestoration of damaged road sides of dam reservoir site of rangit power station
Restoration of damaged road sides of dam reservoir site of rangit power station
Read moreIdamalayar hep fabrication and supply of tunnel adit gate and repair of steps to reservoir and dam bottom
Idr hep fabrication and erection of tunnel adit gate handrail and repair of steps to reservoir and dam bottom at idamalayar dam
Read moreof your Industry type