Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hiring Of Mining Machinery For Excavation Of 10 Lakh Tonne Of Waste In Six Months Including Monsoon Period In South Block Of Donimalai Iron Ore Mine At Donimalai Dist Bellary Karnataka State
|
| Description |
Nmdc/Donimalai/Contract/6/25 26/Et/126
|
| Organisation | NMDC Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NMDC_798460_1 |
|
Reference Number |
DNM/MNG/HMM/SB/LTE/10 LT/2025-26 |
| Tender Fee | 0 |
| EMD | 8.05 Lakh |
| Tender Value | |
| Place | NMDC Donimalai |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1104351 |
| Start Date | May 28, 2025 17:50 |
| End Date |
Expired
30/05/2025
Expired 399 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Transportation of 230000 t (plus 20 percentage) of iron ore fines from kumaraswamy iron ore mine (kiom) b/c block to fines stock pile at beneficiation plant (pellet plant) via kammathor route - donimalai, sandur taluk, district bellary, karnataka 58
Transportation of 230000 t (plus 20 percentage) of iron ore fines from kumaraswamy iron ore mine (kiom) b/c block to fines stock pile at beneficiation plant (pellet plant) via kammathor route - donimalai, sandur taluk, district bellary, karnataka 58
Read moreHiring of mining machineries for excavation of 25 lakh tonnes of waste sub grade ore and low grade ore in maximum two years and minimum 12.5 lt of waste sub grade ore and low grade ore in first year at deposit 10 and11a of b.i.o.m, bacheli complex
Hiring of mining machineries for excavation of 25 lakh tonnes of waste sub grade ore and low grade ore in maximum two years and minimum 12.5 lt of waste sub grade ore and low grade ore in first year at deposit 10 and11a of b.i.o.m, bacheli complex
Read moreHiring of mining machineries to facilitate drainage in south-east zone by waste handling of 2.05 lakh cubic meter in sixty days (60 days) at south block deposit of diom mine
Hiring of mining machineries to facilitate drainage in south-east zone by waste handling of 2.05 lakh cubic meter in sixty days (60 days) at south block deposit of diom mine
Read moreMechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump fod through nmdc weigh bridges in loading plant area
Mechanized excavation, loading, transportation and unloading of 5.00 (five) lakh tons of iron ore fines from dep. 10/11a fine ore stock pile to fine ore dump (fod) through nmdc weigh bridges in loading plant area at an average lead distance of 1.80-
Read moreMonsoon emergency teams
Providing men, material and machinery for monsoon emergency team for a period of 5 months (2024-25) in moosapet circle-23, ghmc
Read moreHiring of mining machinery for excavation of 24 lt of waste in maximum two years and minimum 12 lt of waste in first year of deposit 11c of biom kirandul complex
Hiring of mining machinery for excavation of 24 lt of waste in maximum two years
 and minimum 12 lt of waste in first year of deposit 11c of biom kirandul complex
Read moreHiring of machinery for door to door collection, transportation of municipal solid waste from mc sampla to processing site/ dumpsite for six months in mc sampla
Hiring of machinery for door to door collection, transportation of municipal solid waste from mc sampla to&#x0d processing site/ dumpsite for six months in mc sampla
Read moreObr work at jvr oc-ii mine, kgm area.
Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 573.798 lbcm of in-situ ob (which includes 1.179 lbcm of top soil, 3.279 lbcm of sub soil, 526.304 lbcm of hard ob 43.036 lbcm of coal) and re-handling of 11.385 lcm of loose ob with conventional equipment and additional works viz., 2000 shovel hours 1,65,000 rmt of drilling at jvr oc-ii mine, kgm area during a period of 36 months.
Read moreObr work at godavarikhani coal mine (no.2 2a and no.5), rg-i area.
Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 722.07 lbcm of in-situ ob (which includes 4.716 lbcm of top soil, 681.686 lbcm of hard ob 35.668 lbcm of coal), excavation of 7.645 lbcm of top soil beneath the external dump and re-handling of 17.578 lcm of loose top soil with conventional equipment and additional works viz., 2000 shovel hours, 1000 dozer hours 3,00,000 rmt of drilling at godavarikhani coal mine (no.2 2a and no.5), rg-i area during a period of 36 months.
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreof your Industry type