Tender Details
Particulars | Details |
---|---|
Title |
Provn Of Guard Room With Attached Toilet In Sgnr Mil Stn
|
Description |
Provn Of Guard Room With Attached Toilet In Sgnr Mil Stn
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id | 2025_MES_703971_1 |
Reference Number |
CA NO CWE SGNR T-102 OF 2024-25 |
Tender Fee | 500 |
EMD | 75800 |
Tender Value | |
Place | GE SRI GANGANAGAR |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=788533 |
Start Date | April 23, 2025 23:30 |
End Date |
30/04/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreof your Industry type