Tender Details

Particulars Details
Title
Mtps I Tm Unit Ii Removal And Re Insulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2023 24
Description
Mtps I Tm Unit Ii Removal And Re Insulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2023 24
Organisation Government of Tamil Nadu
Tender Id 2023_EB_368722_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT. 297/ 2023-24
Tender Fee 0
EMD 1300
Tender Value
Place Office of the Superintending Engineer /M-I/MTPS-I
Link https://tntenders.gov.in
Start Date September 12, 2023 14:30
End Date

18/09/2023 ( Expired 629 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Read more
Supply of spares for main turbine gland steam supply and leakoff valve actuators in unit i and ii

Supply of spares for main turbine gland steam supply and leak off valve actuators in unit i and ii

Read more
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Mtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26

Mtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg

Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required

Read more
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Read more
Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026

Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise