Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Supervision Of E And C Of 05 Nos. Front End Loaders 8 9 Cu.M Derated Capacity Along With Cost Cap For 06 Years Or 18000 Hours Whichever Is Earlier For Our Bacheli And Kirandul Complexes
|
| Description |
Supply And Supervision Of E And C Of 05 Nos. Front End Loaders 8 9 Cu.M Derated Capacity Along With Cost Cap For 06 Years Or 18000 Hours Whichever Is Earlier For Our Bacheli And Kirandul Complexes
|
| Organisation | NMDC Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NMDC_791036_1 |
|
Reference Number |
NMDC/HO/MM/PURCH/2024/25/440 |
| Tender Fee | 0 |
| EMD | 25 Lakh |
| Tender Value | - |
| Place | Bacheli and Kirandul |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1095488 |
| Start Date | March 17, 2025 20:00 |
| End Date |
Expired
07/04/2025
Expired 554 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreDraft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Draft global tender enquiry with pre-bid meeting for supply and erection and commissioning of 10 nos. 9-11 cu.m hydraulic excavators derated to 8-9 cu.m for bacheli and kirandul complexes
Read moreProcurement of 7 nos. of 6.4 cu.m (not less than 6.0 cu.m bucket capacity) front end loaders along with spare parts and service supervision under costcap contract for a period of 09 years or 40,000 hours whichever is earlier from the date of commissioning.
Procurement of 7 nos. of 6.4 cu.m (not less than 6.0 cu.m bucket capacity) front end loaders along with spare parts and service supervision under cost cap contract for a period of 09 years or 40,000 hours whichever is earlier from the date of commissioning.
Read moreSupply and supervision of erection and commissioning of 02 nos. backhoe hydraulic excavators along with 6yrs 18000 hrs cost cap whichever is earlier for donimalai complex.
Supply and supervision of erection and commissioning of 02 nos. backhoe hydraulic excavators along with 6yrs 18000 hrs cost cap whichever is earlier for donimalai complex.
Read moreSupply and e and c of 01 no., backhoe hydraulic excavator with bucket derated capacity of 3.2 to 3.6 cu.m along with 6yrs 12000 hrs. cost cap whichever is possible for dmp panna madhya pradesh
Supply and e and c of 01 no., backhoe hydraulic excavator with bucket derated capacity of 3.2 to 3.6 cu.m along with 6yrs 12000 hrs. cost cap whichever is possible for dmp panna madhya pradesh
Read moreof your Industry type