Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kmc/D.G.(P D)/C/122/2024 25
|
| Description |
Refitting And Mending The Damage Due To Untoward Situation Including Cleaning Of Existing Fencing Over Bridges From Dhalai Bridge To Rishi Ashram Bridge.
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_804732_1 |
|
Reference Number |
KMC/D.G.(P_D)/C/122/2024-25 |
| Tender Fee | 0 |
| EMD | 9500 |
| Tender Value | - |
| Place | Multiple Wards, KMC |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1787635 |
| Start Date | January 22, 2025 18:00 |
| End Date |
Expired
01/02/2025
Expired 565 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreKmc/tnp/62/2023-2024
Refitting and mending the damage due to untoward situation including cleaning of existing fencing over bridges from dhalai bridge to rishi ashram bridge.
Read moreKmc/d.g.(p_d)/c/121/2024-25
Refitting and mending the damage due to untoward situation including cleaning of existing fencing over bridges from karunamoyee bridge to doi ghat bridge.
Read moreKmc/tnp/61/2023-2024
Refitting and mending the damage due to untoward situation including cleaning of existing fencing over bridges from karunamoyee bridge to doi ghat bridge.
Read moreRecovery and restoration work of keshpur narajole road (mdr) from 0.00km to 17.680km, total length 17.680km (excluding pqc and jhalka bridge stretch)
Recovery and restoration work of keshpur narajole rd from 0.00to 17.680km, total length 17.680km (excluding pqc and jhalka bridge stretch), under midnapore highway division for mending up damages occurred due to heavy rainfall/ flood like situation.
Read moreDismantling, transporting, repairing and refitting of damaged 10inch dia m.s.pipe of existing 10inch dia delivery of jarlahi patch due to damage during blasting at phularitand, amp colliery
Dismantling, transporting, repairing and refitting of damaged 10inch dia m.s.pipe of existing 10inch dia delivery of 
 jarlahi patch due to damage during blasting at phularitand, amp colliery
Read moreDismantling, transporting, repairing and refitting of damaged 8inch dia m.s. pipe of existing 10inch dia delivery of jarlahi patch due to damage by blasting at phularitand, amp colliery
Dismantling, transporting, repairing and refitting of damaged 8inch dia m.s. pipe of existing 10inch dia delivery of 
 jarlahi patch due to damage by blasting at phularitand, amp colliery
Read moreStone pitching and protection work on bridge over sengur river pul at km. 8 of nh-19 patari durwasha rishi ashram nigohi baraur gurgao road
Stone pitching and protection work on bridge over sengur river pul at km. 8 of nh-19 patari durwasha rishi ashram nigohi baraur gurgao road
Read moreRecovery and restoration work of mathurapur to sankoritola road from ch. 0.00 kmp to 1.65 kmp under malda highway division, in the district of malda for mending up damages occurred due to heavy rainfall flood like situation.
Recovery and restoration work of mathurapur to sankoritola road from ch. 0.00 kmp to 1.65 kmp under malda highway division, in the district of malda for mending up damages occurred due to heavy rainfall flood like situation.
Read moreTemporary restoration due to flood like situation excessive rainfall by mending potholes and patch repairing works of cdp road odr from chainage 0.00 kmp to 1.00 kmp under jhargram sub-division, pwd in the district of jhargram.
Temporary restoration due to flood like situation excessive rainfall by mending potholes and patch repairing works of cdp road odr from chainage 0.00 kmp to 1.00 kmp under jhargram sub-division, pwd in the district of jhargram.
Read moreof your Industry type