Tender Details
Particulars | Details |
---|---|
Title |
Loading, Transportation, Laying And Fitting For Spray Pipeline Installation From 35 D/ 2 L To 22 L/3 D Via Borehole With 4 In Dia Ms Pipeline And 3 In Dia Ms Pipeline In From Rvi To Rv In Cm2 Section.
|
Description |
Loading, Transportation, Laying And Fitting For Spray Pipeline Installation From 35 D/ 2 L To 22 L/3 D Via Borehole With 4 In Dia Ms Pipeline And 3 In Dia Ms Pipeline In From Rvi To Rv In Cm2 Section.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_323298_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/98 dated 09.12.2024 |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335119 |
Start Date | December 17, 2024 16:30 |
End Date |
27/12/2024 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tender for road transportation of bulk pol products (ms /hsd /branded fuels etc.) by bottom loading tank lorries from bpcl ennore coastal installation, tamil nadu to various locations (depots/retail outlets/ direct customers, etc.) within state (ws) and outside state (os)
Tender for road transportation of bulk pol products (ms /hsd /branded fuels etc.) by bottom loading tank lorries from bpcl ennore coastal installation, tamil nadu to various locations (depots/retail outlets/ direct customers, etc.) within state (ws) and outside state (os)
Read moreTransportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Transportation, laying and fixing of 4 inch dia. pipeline for supplying water for cm machine operation in proposed depillaring panel cm-4a, cm-4b and cm-5 panel at vindhya ug mine, pinoura sub area, johilla area
Read moreMaking of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.
Making of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.
Read moreA/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u
A/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u
Read moreProviding and laying of hdpe pipeline dia.280,180mm pe-80 4kg/cm2 ,is 4984-2016 standards including all allied electrical and civil works with material from stp talwara to farmer fields distt hsp for supply of treated water for irrigation
Providing and laying of hdpe pipeline dia.280,180mm pe-80 4kg/cm2 ,is 4984-2016 standards including all allied electrical and civil works with material from stp talwara to farmer fields distt hsp for supply of treated water for irrigation
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreDismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Read moreLaying of bt and cc roads along with the installation of single arm lighting at various locations in kodangal municipality under tufidc assistance
Laying of bt and cc roads along with the installation of single arm lighting at various locations in kodangal municipality (from gundlakunta main road to mogalalidarga, mahabubnagar road to gundlakunta village, gundlakunta main road to gurunath reddy sir fields, kammarigovind fields to yenkepally road, gandhi nagar to dargah, pathakodangal to lalappa fields, vinayakchowraasta to revanth reddy sir house, inanpally water tank to chitlapally road, revanth reddy sir house to chitlapalli road, bulkapur road to chitlapally road, tandoor doctor venkatesh house to pilkanragadiyenkapally road, from bandalaellamma temple to kasturibha school via community hall etc.) under tufidc assistance
Read moreCs for preparation of dpr for upgradation to 4 lane/2l plus ps of parour to chauntra from km 100.840 to km 140.625 and chauntra to padhar from km 140.625 to km 180.00 of pathankot mandi section of nh154 in himachal pradesh through bot/ham/epc mode
Cs for preparation of dpr for upgradation to 4 lane/2l plus ps of parour to chauntra from km 100.840 to km 140.625 and chauntra to padhar from km 140.625 to km 180.00 of pathankot mandi section of nh154 in himachal pradesh through bot/ham/epc mode
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreof your Industry type