Tender Details

Particulars Details
Title
Proposal For 03 Nos 8 Inch Dia Downward Dewatering Vertical Bore Hole From Rvi Seam To Rv Seam At Mic Unit Jpc
Description
Proposal For 03 Nos 8 Inch Dia Downward Dewatering Vertical Bore Hole From Rvi Seam To Rv Seam At Mic Unit Jpc
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_319256_1
Reference
Number
ECL/GM/JNR/MIN.A/24-25/26 Dt. 15.10.2024
Tender Fee 0
EMD 8900
Tender Value
Place Jhanjra Project Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330904
Start Date October 18, 2024 16:30
End Date

28/10/2024 ( Expired 198 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Drilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area

Drilling of 03 nos. 8 inch (eight inch) dia borehole for dewatering of mine water at shiwani ug mine under bhatgaon area

Read more
Cleaning of sand bunker and vertical borehole from surface to kenda r vi seam at north jambad unit of bahula colliery under kenda area ecl

Cleaning of sand bunker and vertical borehole from surface to kenda r vi seam at north jambad unit of bahula colliery under kenda area ecl

Read more
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area

Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area

Read more
Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.

Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.

Read more
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.

Read more
Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Construction of 10 nos. pcc ventilation stopping in bp top seam for proper ventilation between 16l and 15l from 33r to 35r to 43 rise at virgin property of bp top seam at badjna colliery.

Read more
Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area

Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area

Read more
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Providing and laying 150 mm dia fire fighting line from zanskar hostel pump room to 03 nos. boys hostels (shivalik hostel, vindhyanchal hostel and kumaun hostel) in west campus area at iit delhi

Providing and laying 150 mm dia fire fighting line from zanskar hostel pump room to 03 nos. boys hostels (shivalik hostel, vindhyanchal hostel and kumaun hostel) in west campus area at iit delhi

Read more
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise