Tender Details

Particulars Details
Title
Proposal For 03 Nos 8 Inch Dia Downward Dewatering Vertical Bore Hole From Rvi Seam To Rv Seam At Mic Unit Jpc
Description
Proposal For 03 Nos 8 Inch Dia Downward Dewatering Vertical Bore Hole From Rvi Seam To Rv Seam At Mic Unit Jpc
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_319256_1
Reference
Number
ECL/GM/JNR/MIN.A/24-25/26 Dt. 15.10.2024
Tender Fee 0
EMD 8900
Tender Value
Place Jhanjra Project Colliery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330904
Start Date October 18, 2024 16:30
End Date

28/10/2024 ( Expired 176 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area

Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area

Read more
Maintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project

Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area

Read more
Providing and laying 150 mm dia fire fighting line from zanskar hostel pump room to 03 nos. boys hostels (shivalik hostel, vindhyanchal hostel and kumaun hostel) in west campus area at iit delhi

Providing and laying 150 mm dia fire fighting line from zanskar hostel pump room to 03 nos. boys hostels (shivalik hostel, vindhyanchal hostel and kumaun hostel) in west campus area at iit delhi

Read more
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Read more
Drilling of 3 nos of 12.5 inches dia bore holes at srp-3 and 3a incline, srp

Drilling of 3 nos of 12.5 inches dia boreholes for a depth of 50 mtrs each with casing of 8 inches dia ms pipes and lowering of 6 inches dia gi or ms pipes from surface to 3 seam for stowing purpose near stowing bunker-2 (south) at srp-3 and 3a incline, srp area as per scope of work, terms and conditions of nit

Read more
Providing and laying 250mm dia storm water pipe line with road gully chamber for disposal of stanging water along the road from h.no.107 to 114 in surya nagar (sector-91) phase -1 and providing rcc slab at various crossing on drain type-1 with 2 nos

Providing and laying 250mm dia storm water pipe line with road gully chamber for disposal of stanging water along the road from h.no.107 to 114 in surya nagar (sector-91) phase -1 and providing rcc slab at various crossing on drain type-1 with 2 nos

Read more
Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.

Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.

Read more
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar

Read more
Installation and commissioning of 3phase, 4wire 3.3kv overhead line from sarpi substation to majhi para bore hole with energy meter for proposed lhcm1 of gcpl at shyamsundarpur colliery under bankola area

Installation and commissioning of 3phase, 4wire 3.3kv overhead line from sarpi substation to majhi para bore hole with energy meter for proposed lhcm1 of gcpl at shyamsundarpur colliery under bankola area

Read more
Renovation of one (01) no. vertical borehole in stowing bunker no. 2 (used for sand stowing) of 133m. depth and 150mm. dia from surface to kenda (r-vi) working at 25 dip/ 2dip level of parasea colliery under kunustoria area.

Renovation of one (01) no. vertical borehole in stowing bunker no. 2 (used for sand stowing) of 133m. depth and 150mm. dia from surface to kenda (r-vi) working at 25 dip/ 2dip level of parasea colliery under kunustoria area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise