Particulars | Details |
---|---|
Title |
Supply Erection Testing And Commissioning Of 2 Nos 125 Kva 415 V Dg Set With Amf Panel And Accessories For Eht Substations And Dismantling Of 1 No Existing 75 Kva Dg Set In Chennai North Sriperumbudur Operation Circle
|
Description |
Supply Erection Testing And Commissioning Of 2 Nos 125 Kva 415 V Dg Set With Amf Panel And Accessories For Eht Substations And Dismantling Of 1 No Existing 75 Kva Dg Set In Chennai North Sriperumbudur Operation Circle
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_DLB_416139_1 |
Reference Number |
E-09/2024-25 |
Tender Fee | 0 |
EMD | 17360 |
Tender Value | |
Place | Chennai |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632083 |
Start Date | March 12, 2025 16:30 |
End Date |
25/03/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection and commissioning of 1 no. of 125 kva /100kw d.g. with acoustic enclosure, standard control panel and allied works in tagore arts and science college, lawspet, puducherry
Supply, erection and commissioning of 1 no. of 125 kva /100kw d.g. with acoustic enclosure, standard control panel and allied works in tagore arts and science college, lawspet, puducherry
Read moreSitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs 649/5514 including plc based amf panel, complete cabling, const. of c.c. foundation and other associated works complete at tw in zone-1 and 2 of npp muzaffarnagar
Read moreProcurement erection testing and commissioning of oil free screw air compressor (ofsac) using existing 3.3 kv 340 kw ht electric motor drive at mtps ii including dismantling of old elgi make nh265 9 model compressor in sac a b 2 nos
Procurement erection testing and commissioning of oil free screw air compressor (ofsac) using existing 3.3 kv 340 kw ht electric motor drive at mtps ii including dismantling of old elgi make nh265 9 model compressor in sac a b 2 nos
Read moreA/r m/o residential building under maintenance section under sub - division no. i, nacd, apwd, mayabunder.sw-construction of septic tank cc toe wall at mayabunder.sh-supplying, installation and testing and commissioning of amf panel for 62.5 kva dg
A/r m/o residential building under maintenance section under sub - division no. i, nacd, apwd, mayabunder.sw-construction of septic tank cc toe wall at mayabunder.sh-supplying, installation and testing and commissioning of amf panel for 62.5 kva dg
Read moreSupply, installation , testing and commissioning of 58.5 kva as per cpcb-iv, 3phase, 415v ac, silent dg set comprising of engine, with minimum 74 bhp, at 1500 rpm, coupled with alternator of same make mounted on a common base frame complete with
Supply, installation , testing and commissioning of 58.5 kva as per cpcb-iv, 3phase, 415v ac, silent dg set comprising of engine, with minimum 74 bhp, at 1500 rpm, coupled with alternator of same make mounted on a common base frame complete with
Read moreSupply, erection, testing and commissioning of 7 nos. 250 kva, 415v dg with amf panel
Supply, erection, testing and commissioning of 7 nos. 250 kva, 415v dg with amf panel
Read moreSitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar
Sitc of 10 nos. 82.5 kva dg set at 1500 rpm, 415 volt, 50 hz, 3 phase conforming to bs-649-5514 including plc based amf panel, complete cabling and other associated works complete in all respect at tubewells in zone-1 and 2 of npp muzaffarnagar
Read moreSupply, installation , testing and commissioning of 58.5 kva as per cpcb-iv, 3phase, 415v ac, silent dg set comprising of engine, with minimum 74 bhp, at 1500 rpm, coupled with alternator of same make mounted on a common base frame complete with
Supply, installation , testing and commissioning of 58.5 kva as per cpcb-iv, 3phase, 415v ac, silent dg set comprising of engine, with minimum 74 bhp, at 1500 rpm, coupled with alternator of same make mounted on a common base frame complete with &#x0d
Read moreSupply , installation , testing and commissioning of 1 no 2000 kva dg with amf panel and lt extension panel and other accessories for cri building at actrec campus
Supply , installation , testing and commissioning of 1 no 2000 kva dg with amf panel and lt extension panel and other accessories for cri building at actrec campus
Read moreDesign engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Design engineering supply of materials equipment erection testing and commissioning of 04 nos 220 kv bays at ttps switchyard along with dismantling loading and unloading transportation of existing damaged equipment from site store of tvnl on turnkey
Read moreof your Industry type