Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
For Conducting The Residual Life Analysis Test Of 20 Mva T/F (Gec Make) At 400 Kv Sub Station Greater Noida Under Electricity 400 Kv Sub Station Division Greater Noida Under Etc Greater Noida
|
| Description |
For Conducting The Residual Life Analysis Test Of 20 Mva T/F (Gec Make) At 400 Kv Sub Station Greater Noida Under Electricity 400 Kv Sub Station Division Greater Noida Under Etc Greater Noida
|
| Organisation | UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT |
| Tender Id | 2025_UPTCL_1074524_1 |
|
Reference Number |
T-18/2025-26ETC/GN |
| Tender Fee | 590 |
| EMD | 2000 |
| Tender Value | - |
| Place | GREATER NOIDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1962134 |
| Start Date | September 17, 2025 14:30 |
| End Date |
Expired
22/09/2025
Expired 392 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and erection of 400 kv, 220 kv and 132 kv bays, 315 mva, 400/220/33 kv transformer, 400 kv reactor, 160 mva, 220/132/33 kv transformer at kharagpur and gokarna 400 kv sub station and allied works on turn key basis.
Construction and erection of 400 kv, 220 kv and 132 kv bays, 315 mva, 400/220/33 kv transformer, 400 kv reactor, 160 mva, 220/132/33 kv transformer at kharagpur and gokarna 400 kv sub station and allied works on turn key basis.
Read moreWork of checking the online health monitoring of cts, pts and las and work of residual life assessment of 25 mva power transformer at 220 kv substation chamba
Work of checking the online health monitoring of cts, pts and las and work of residual life assessment of 25 mva power transformer at 220 kv substation chamba
Read moreDesign, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Design, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Read moreExtension of 765/400 kv champa substation under the transmission scheme augmentation of transformation capacity at 765/400 kv champa substation by installation of 1500 mva, 765/400 kv ict (7th ict on bus section-b)
Extension of 765/400 kv champa substation under the transmission scheme augmentation of transformation capacity at 765/400 kv champa substation by installation of 1500 mva, 765/400 kv ict (7th ict on bus section-b)
Read moreFor shifting of 220 kv mc sector-24 yeida line (krr design) under electricity 400 kv sub station division, greater noida under electricity transmission circle, upptcl, greater noida.
For shifting of 220 kv mc sector-24 yeida line (krr design) under electricity 400 kv sub station division, greater noida under electricity transmission circle, upptcl, greater noida.
Read moreProviding street light on 45 meter wide road infront of 220 kv sub-station jalpura, greater noida.
Providing street light on 45 meter wide road infront of 220 kv sub-station jalpura, greater noida.
Read moreConducting third-party protection audit of 126 nos 400 kv and 220 kv grid sub-stations of pstcl for compliance with iegc 2023
Conducting third-party protection audit of 126 nos 400 kv and 220 kv grid sub-stations of pstcl for compliance with iegc 2023
Read morePurchase of 02 nos. 500 mva, 400/220/33 kv auto power transformers including spares against bn -9019002604
Purchase of 02 nos. 500 mva, 400/220/33 kv auto power transformers including spares against bn -9019002604
Read moreWork of loading of 400kv,220kv, 315 mva transformer from 400kv substation bareilly and carriage, unloading at 400 kv substation orai
Work of loading of 400kv-220kv, 315 mva transformer from 400kv substation bareilly and carriage, unloading at 400 kv substation orai
Read moreCamc for 3 years of 1000 kva dry type transformer,11 kv ht/lt panel and d.g set at lohiya enclave sector-12, greater noida.
Camc for 3 years of 1000 kva dry type transformer,11 kv ht/lt panel and d.g set at lohiya enclave sector-12, greater noida.
Read moreof your Industry type