Tender Details

Particulars Details
Title
Construction Of 40.00 Mtr Span Bridge Over Barag Khad At Rd 12/360 On Kharkoli To Koti Dhiman Road 0/00 To 15/170 And Construction Of 33.00 Mtr Span Bridge Over Chandog Khad At Rd.7/375 On Road Bharari Bohn Via Chokan Tikrahn Chandog 0.00 To 12.8
Description
(Sh Geotechnical Investigation, Preparation Of Hydraulic Data And Preparation Of Gad).
Organisation PWD | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 500
EMD 24800
Tender Value
Place SANGRAH
Link

AAAAAAAAAA

Login to view
Start Date May 27, 2025 22:30
End Date

04/06/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).

Construction of 110 mtr span double lane&#x0d motorable bridge over river beas at pandoh on pandoh&#x0d nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)&#x0d (package no. hp-08-570).

Read more
Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Read more
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)

Read more
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a

Read more
Construction of 28.00 mtrs. single span steel truss bridge (through type) over sainj khad at 9/230 on sainj neuli kartah road under pmgsy-iii (batch-i) package no.hp-06-162 a.

Construction of 28.00 mtrs. single span steel truss bridge (through type) over sainj khad at 9/230 on sainj neuli kartah road under pmgsy-iii (batch-i) package no.hp-06-162 a.

Read more
C/o 49.00 meter single span steel truss (through type) bridge over chenab river at km. 0/660 on main road to bhilali triloknath lobber udaipur road km. 0/000 to 13/970 under pmgsy-iii batch-i package no.hp-07-158 a.

C/o 49.00 meter single span steel truss (through type) bridge over chenab river at km. 0/660 on main road to bhilali triloknath lobber udaipur road km. 0/000 to 13/970 under pmgsy-iii batch-i package no.hp-07-158 a.

Read more
A.r and m.o on nh.305 sainj luhri aut road km 0.00 to 97.00 .sh. construction of edge wall in pcc for approach road and construction of pcc dirt wall on both ends of manglour bridge at rd 79.875 under nh sub division banjar.

A.r and m.o on nh.305 sainj luhri aut road km 0.00 to 97.00 .sh. construction of edge wall in pcc for approach road and construction of pcc dirt wall on both ends of manglour bridge at rd 79.875 under nh sub division banjar.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise